Thursday, February 19, 2009

MEMORANDUM BEFORE THE HON’ COMMITTEE CONSTITUTED BY MINISTRY OF RAILWAYS VIDE ORDER NO ERB-1/2009/23/1, DATED 09-01-09.

To,

THE MEMBERS OF THE COMMITTEE,
RAILWAY BOARD,
NEW DELHI.


Respected sir,

This union submit this memorandum before the committee in order to express our opinion and the aspiration of the Loco Running staff of Indian Railways on the matter under the terms of reference of the committee.
At the outset we submit as follows
In relation to Running staff the Railway Board have a concept that had there been no Running allowance scheme, the highest post of Loco Running cadre i.e. the Loco pilot (mail) would have allowed the highest Group ‘C’ scale. The difference is filled by a percentage of pay allowed as pay element. And further held by Railway Board that the difference or measure of depression were gradually eroded after the implementation of 4th 5th and 6th CPC and at present the depression stand at 3 to 4 %. But we earnestly say that this is not based on fact.
After the implementation of 6th CPC the highest group ‘C’ posts like Nurses, Teachers, Section Officers are being allotted with a grade pay of Rs 4800 and Rs 5400 and the entry pay in the pay band of 9300-34800, as per section II of Railway Service (Revised pay) Rules 2008, will be fixed at Rs 13350, and Rs 15600 respectively. A lot of posts which was in Rs 7450-11500, and allowed with a grade pay of Rs 4600 with an entry grade pay Rs 12540. Even other wise, those whose pay is at 7450 in scale 7450-11500 has been a normal fixation in the pay band of 9300-34800 is at Rs 13860.
But in the case of Loco Running staff, who become promoted to the post of Loco Pilot with a grade pay of Rs 4200 will be fixed at Rs 9300 in scale 9300-34800. In nutshell, the entry pay in pay band for Grade Pay Rs 4200, 4800, 5400 is 9300, 13350 and 15600 respectively.
The difference of pay in pay band of Loco Pilot and of highest Group ‘C’ stand at Rs 3240 and difference in grade pay of Rs 400, totally at Rs 3640, even assumes that the highest Group ‘C’ post carries a grade pay of Rs 4600, leave alone the grade pay of Rs 4800 and Rs 5400 given to many Group ‘C’ posts. If took Rs 4800 and Rs 5400 grade pay with an entry pay of 13350 and 15600 then the depression stands at Rs 4050 and 6300.


2.

This is the measure of depression still exist. If calculated in percentage in relation to the pay in pay band of Loco pilot, the depression stands for 35%, 45% and 68% in relation to the pay in pay band whose grade pay is Rs 4600, 4800 and Rs 5400 respectively to whom the Loco pilot has been equated.
Therefore the whole concept of Railway Board that the depression factor has reduced has no base and against the actual position prevails.
If we look in another way what took place for the post of Loco Pilot (mail and Loco Pilot (passenger) in relation to the pay is more pathetic.
One who promoted to the post of Loco Pilot(mail) at its minimum of Rs 6000, his pay plus Dearness allowance alone come to Rs 12710 prior to VI CPC, where as after implementation, if one promoted to this post, the pay will be fixed at 9300. Many posts which have a minimum of scale at Rs 6500 were elevated to Rs 7450 and those who are promoted to that post the fixation in pay band will be at Rs 12540 according to section II of Pay Rules 2008. a reduction of around Rs 3000 were affected for the Loco Pilot (mail), the same for Loco Pilot (passenger). Added to this in the name of package the rate of Running allowance fixed without taking RAC 80 formulae further slashed the pay packet.
There fore the whole concept of the Railway Board that the depression factor had reduced were without any base and against actual position now prevails. We were surprised and sad when we heard that depression now is 2 to 3% from our Honorable Chairman, Railway Board on 6th February 2009 and we are loose to understand whether such statement from a high ranking officer emanated from ignorance or pretended to be ignorant to the fact.
But for these wrong concept, we feel, a reluctance created in the mind of the Board official to rectify the anomalies erupt in the pay structure of Loco Running staff. It is equally sand to see that when the top brasses of Army, Navy and Air Force including their Minister join together to see that their subordinate get a better package from pay revision, our bosses try to disregard, and try to reduce whatever the subordinate should get in normal course.

THE WOES OF ASSISTANT LOCO PILOT

The worst affected post in the cadre of Loco Running staff is the Assistant Loco Pilot. There were equated with Assistant Guard, and both are in the same Pay band and on same grade pay of Rs 1900. Assistant guards required qualification of pass in the 8th standard, no responsibility to ensure safety in train operation, no high medical standard required, no necessity to aquint the terrain, location of signal, trouble shooting of train, but only to see the loading and unloading of parcels. Whereas Assistant Loco Pilot’s entry qualification is ITI preferably Diploma in Engineering, the medical standard is the highest who is class Aye I. But in pay package they were put in equal, even for retirement benefit there were similarity. On recruitment the Assistant Loco Pilot have to go through a stringent psychology test to assess the quality of mechanical comprehension, trainability for rules and procedures, concentration, vigilance safety critical and leadership quality.
3.

The ability required to the post of Assistant Loco Pilot assessed by the Railway Recruitment Board as prescribed by the Railway Board.
1. Undertake the physical requirement of the position.
2. Maintain vigilance and concentration particularly when coming out repetitive, tiring or monotonous tasks.
3. React quickly in compliance with safety requirement, to changing situation.
4. Co-ordinate the use of controls operated by hand and foot necessary for safe train driving.
5. Use English to communicate clearly both orally and in writing, to convey safety messages.
6. Check and not to make assumption, even when it is more convenient to do so.
7. Retain and recall safety relation information, including that which will only be used in emergencies.
8. Comply with procedures, rules and standards, particularly when unsupervised or under pressure of time.
9. Respond to emergency or other stressful situation calmly and when required direct others.
10. Work alone for long period, applying the appropriate competence standard at all times.

These are the minimum standard required to hold the post of Assistant Loco Pilot. There after under go a 9 months initial training as prescribed by the Railway Board vide letter No E (mpp) 98/3/8 dated 22-06-98.

Mode no Description Duration

RNG-1 Indian Railways- General Information 2 weeks
And Business Environment, Fire Fighting
Hygiene, First aid.
RNG-2 Basic of electrical/mechanical engineering 2 weeks
Including Over Head Equipments in electrical
Territory.
RNG-3 Familiarization with the lay out and working
Of various types of locos, sub-systems/sub
Assemblies 6 weeks
RNG-4 Familiarization with relevant aspect of coaches
And wagons for tackling problems on run 2 weeks
RNG-5 Locomotive operating instructions and trouble 3 weeks
Shooting
RNG-6 Safety items of Loco and safety equipment
Provided to running staff and on loco 1 week
RNG-7 Examination of Loco while turning out from
Shed, taking over from previous crew including

4.

Familiarization with repair book, trip card, joint
Guard and Loco pilot report. 2 weeks
RNG-8 Transportation training at Zonal Training Centre 6 weeks
RNG-9 Functioning of shed lobby/crew booking lobby. 1 week
RNG-10 Functioning of Control Office 1 week
RNG-11 Learning road and foot plate train under
Instructor’s supervision. 2 weeks
RNG-12 Learning road on foot plate train under
Loco Inspectors supervision. 8 week
RNG-13 Simulator Training 1 week
RNG-14 Review and Examination 2 week

Besides these the arduousness of the very nature of duty, uncertain duty hours for a longer time, and the long absence from family for a full life span and the responsibility attached the post cannot be compared with assistant guard or that of lowest post in central government. The assistant loco pilot placed in par with assistant guard in pay structure and assistant’s loco pilot’s grade pay was just Rs 100 more than the lowest post in Railway has to be looked into and rectified.
In past this were not the position for first Fireman / Assistant loco pilot in pay parity with others

Period Assistant Loco pilot/ Guard Assistant Guard
First Fireman

Ist CPC Rs 75-105 Rs 60-170
3rd CPC Rs 290-350 Rs 290-400 Rs 225-270
1983 cadre
Restructuring Rs 290-350 Rs 330-530 Rs225-270
4th CPC Rs 950-1500 Rs 1200-2040 Rs 950-1400
5th CPC Rs 3050-4590 Rs 4500-7000 Rs3050-4590
6th CPC GP 1900 GP 2800 GP 1900

Every pay commission of cadre restructuring implemented the Guard ‘C’ scale/pay has been steadily increased from the minimum pay of Rs 60 to grade pay 2800, where as the Assistant Loco pilot rose from Rs 75 to grade pay of Rs 1900.

The lowest post in Railway also has increased gradually over the years

Year Lowest post Assistant Loco Pilot
Minimum of scale minimum of scale

I st CPC Rs 30 Rs 75
IIIrd CPC Rs 196 Rs 290
IV th CPC Rs 750 Rs 950
5.

Vth CPC Rs 2550 Rs 3050
VI th CPC GP 1800 GP 1900

No proportionate increase allowed to the post of Assistant Loco Pilot as allowed to lowest post in Railway after one pay commission to other.
Now Assistant Loco Pilot stands similar to lowest post and considerably push back from their similar position to Guard ‘C’.
It may please be noted that at the minimum of the 5th CPC basic pay for Assistant Loco Pilot, ie, Rs 3050, the total pay as on 01-01-2006 comes to Rs 6460 as pay band. Where as the minimum pay band fixed as on 01-01-2006 was Rs 5830 according to section II of Railway Services (Revised Pay) Rules, 2008, notified vide CSR No. 643E dated, 04-09-2008.

There is a reduction of Rs 630 in Grade Pay alone with corresponding reduction in other allowances such as Dearness Relief, HRA etc.
It is also there grievances that inspite of a higher recruitment qualification of Matriculation + ITI, preferably Diploma in Engineering, 9 months intensive training before absorption, higher medical standard and high responsibility attached to post than any post which carried a pay scale Rs 3050-4590, under 5th CPC as of ALP had been allowed with higher pay by the 6th CPC.

The following posts which carried a pay scale of Rs 3050-4590 as of ALP were upgraded by 6th CPC to Rs 4500-7000 with grade pay of Rs 2800.
The case of Assistant Class II in Calcutta mint under Ministry of Finance in pay scale of Rs 3050-4590 were upgraded to Rs 4500-7000 with a Grade Pay of Rs 2800. Their initial pay band on 01-01-2006 will be Rs 8560 according to Section II of Railway Services (Revised pay) Rules in PBI with grade pay of Rs 2800, and the total pay will be 8560 +2800=11,360/- where as the ALP will stand at 5830+1900=7730 as on 01-01-2006. A huge difference of Rs 3630 in the pay packet besides corresponding difference in DA, HRA etc.

Moreover thousands of posts which carried a scale of Rs 3050-4590 under various Ministries were upgraded to Rs 3200-4900, i.e., PBI+Rs 2000 as Grade Pay, which are:-

1. Constable under Home Ministry as Railway Ministry, CBI, RPF.
2. Postmen under Department of Posts
3. Leading Fireman of firefighting force
4. Mail Guard in Railway mail service
5. Navik in Coast Guard
6. Assistant Class II in Govt. mint.
7. Notice server in department of Revenue
8. Carpenter in film division
9. Forest guards

6.

Their pay will be fixed in the pay band I at Rs 6460 with a grade pay of Rs 2000, which comes to a total pay packet of Rs 8460, whereas ALP with a Pay Band of Rs 5830+GP Rs 1900 will come up to Rs 7730 only, lesser by Rs 700.
It may be noted that under the Central Government Service/Railway Service which have an entry grade pay of Rs 1900, the percentage of posts in that grade is less than 15% where as in the Loco Running Cadre, ie, Assistant Loco Pilot is 40% and more of the total cadre strength. It may also be noted that out of the total ALP posts, a meager 30% posts are in Rs 4000-6000(under 5th CPC) which were allowed with pay band I+ Grade Pay of 2400. in this case also the entry pay in the revised pay for direct recruits appointed on or after 01-01-2006 will be fixed at Rs 7510 in PB I with a grade pay of Rs 2800 , where as ALP with a grade pay of 1900 in PB I never get the entry pay in pay band at Rs 7510 when promoted to grade pay of Rs 2400.

Therefore the pay structure of Assistant Loco Pilot be modified suitably.
At present the pay structure are as follows.
30% ALP in Rs 5200-20200 with Grade Pay Rs 1900
70% ALP in Rs 5200-20200 with Grade Pay Rs 2400
To maintain the vertical and horizontal relativity with Guard ‘C’ and other posts the Assistant Loco Pilot be upgraded to Grade Pay of Rs 2800.
Apart from these the responsibility attached to the post of Assistant Loco Pilot, the job attribute, the arduousness in performing the duty are almost similar to that of Loco Pilot. Considering these position the Railway Board upgraded the post of Assistant Loco Pilot in Rajadhani, Shatabdi express to co-pilots. The Running Allowance Committee 2002 after a detailed study recommended that the trains which are running at a booked speed of 100 KMPH the Assistant Loco Pilot posts on that trains should be upgraded to co pilots.

This may be conceded and implemented not only to see the enhancement of pay packet to ALP, but on safety in train operation. Effective assistance to be provided for such superfast train which runs continuously for hours together without a stop or relaxation to the crew.

PAY PARITY BETWEEN LOCOPILOT AND GUARD

Your good self in agreement that the responsibility, nature of duty, the skill required, the onerousness in performing running duty are much different between a Guard and Loco Pilot. From the inception of Railway, the pay packet of Loco Pilot are much higher than the Guard in consideration of the above fact. When the V CPC allowed Rs 5500-9000 for both the Guard (mail) and Loco Pilot (mail), the issue was put before the fast track committee by the Railway Board. The Fast Track Committee revised the pay scale of Loco Pilot (mail) and replaced with Rs 6000-9800. After the implementation of the VI the CPC the Guard(mail) and Loco Pilot (mail) again allowed with same pay band and same grade pay with a mere Rs 500 difference in allowance. The retirement benefit for Guard(mail) and Loco Pilot(mail) become one and the same. Vertical relativity in pay has been totally disturbed. Unequal are treated equals. The
7.

discrimination caused to Loco Pilot(mail) and Loco Pilot(passenger) who finds nothing more than the Guard’s pay is reconsidered and their grade pay may be changed as follows.

Loco Pilot (passenger) - Grade Pay-4800
Loco Pilot (mail) - Grade Pay-5400

INADEQUATE PAY SCALE OF LOCO PILOT (SHUNTING)

The pay of Loco Pilot (shunting) and Goods Guards were one and the same prior to Vth CPC. In order to restore the age old relativity with goods Guards and also to maintain the relativity to the feeder categories of Assistant Loco Pilots the grade pay of Loco Pilots(shunting) increased to Rs 4200.

ANOMALIES DUE TO MERGER OF PAY SCALES

The following six categories in loco running cadre with different pay scales and distinct functions are allotted with one and the same grade pay of Rs 4200 in PB2.
1. Loco Pilot(shunting ) Grade I Rs 5000-8000
2. Loco Pilot(goods ) Grade I Rs 5000-8000
3. Loco Pilot(Goods ) Grade II Rs 5500-9000
4. Loco Pilot(Passenger)II/Motor Man II Rs 5500-9000
5. Loco Pilot(Passenger)I/Motor Man I Rs 6000-9800
6. Loco Pilot(Mail) Rs 6000-9800

The recommendation of the commission on merger of pay scales was that, it should first beseen if the posts in the three pay scales viz 5000-8000, 5500-9000 and 6500-10500 can be merged without any functional disturbance. The duties attached to these posts in Loco Running cadre are having functional differences. Therefore on functional considerations distinct Grade Pay should be allotted to each of the posts.
In 1997 Fast Track Committee (FTC) has allotted higher and distinct scale of Rs 6000-9800 exclusively for Loco Pilot (mail)/Loco Pilot (passenger) grade I. The contention of the VIth CPC that the new scale is given only because of bursting out of pay of Loco Pilot (mail) is base less. If it was so the FTC would have solved it by increasing upper limit of Rs 5500-9000scale to 9800. But it was done to maintain the historical relativity with Mail Guards. The scale Rs6000-9800 is nearer Rs 6500-10500 than Rs 5500-9000 and the recommendation to treat Rs 6000-9800 and Rs 5500-9000 as one is unjust. Otherwise the Loco Pilot (passenger) grade I and Loco Pilot (mail) would have automatically gone to Grade Pay of Rs 4600 in PB2.

Another anomaly is that 27% Loco Pilot (goods) and Loco Pilot (passenger) who were getting the pay in the next higher grade is merged to the lower scale.
The revised system of allowing same pay structure to all these six categories will result in difficulties in filling up the higher posts as no increase in pay is allotted for taking up
8.

higher responsibilities. So all the posts with distinct functions should be given different grade pays.
The Staff Nurse in the scale of Rs 5000-8000 and Nursing Sister in the scale of Rs 5500-9000 were given Grade pay of Rs 4600 and 4800 respectively. Assistant Nursing Superintendent in the scale of Rs 6500-10500 was allotted with Grade Pay of Rs 5400. i.e., even in the case where there is least functional differences, three distinct grade pays are allowed whereas Loco Pilot(shunting) I, Loco Pilot (goods), Loco Pilot (passenger) and Loco Pilot (mail) having distinct functions are not given any higher Grade Pays.

EFFECT OF MODIFIED ACP

Directly recruited Motorman are appointed in Grade Pay of Rs 4200. On completion of 10 years, he will get his first financial up gradation to Grade pay of Rs 4600, 20th year to Rs 4800 and 30th year to Grade Pay of 5400.
Similarly Pro Guards with whom Loco Running staff has an established relativity will get his third promotion under modified ACP to the Grade Pay of Rs4800.
The third promotion to directly recruited station masters, Ministerial Staff, Commercial Clerks etc will also attain Grade Pay of Rs 4800. But there are no chance for the Loco Pilots to reach to Grade Pay of Rs 4600, 4800 and 5400.

IN SUMMARY THE PAY SCALES OF LOCO RUNNING STAFF BE MODIFIED AT LEAST AS UNDER:-

Fireman II PB1+GP Rs 2400/-
Fireman I/Assistant Loco Pilot PB1+GP Rs 2800/-
Loco Pilot (Shunting) PB2+GP Rs 4200/-
Loco Pilot (Goods) PB2+GP Rs 4600/-
Loco Pilot(Passenger) PB2+GP Rs 4800/-
Loco Pilot(Mail) PB2+GP Rs 5400/-
Loco Inspectors PB2+GP Rs 5400/-

FIX UP SAME MINIMUM PAY FOR PROMOTEES AND DIRECT RECRUITS

The entry pay for direct recruits in various grade pays are notified in the first schedule section II of Railway services (revised Pay) Rules 2008. This will bring inequality to one reaches on that grade on promotions. So the entry pay notified to direct recruits should be made applicable to those reach the grade by promotions.

EXTEND ADDITIONAL ALLOWANCE TO ALP AND LOCO PILOT (GOODS)

An additional allowance of Rs 500/1000 is allowed to Loco Pilot (Passenger) and Loco Pilot(mail) respectively. The ALP’s working in passenger and Express trains too are facing the same working conditions and there is no valid ground to refuse the same. The working nature of Loco Pilot (Goods) too is also onerous and hence this additional

9.
allowance should be extended to all Loco Running staff and the same should be treated as pay for all purpose such as HRA, Running allowance and retirement benefits etc. Accordingly the definition of basic pay should include the additional allowances too.

SPECIAL JOB ATTRIBUTES OF MOTORMAN IN VIEW OF SINGLE MAN OPERATION

The General Rules provision of having two people in the locomotive cabin is restricted to single man operation in EMU train working. While driving they have to remain in the same position with their arm on a control called the Dead Man’s handle. It is only when stopped in stations, they can relax, that too for a maximum of 30 seconds of stoppage time. They use their hands and feet to operate speed, brakes and other controls like horn, etc. Generally these EMU trains are running through sections with high density in population which requires extra vigilance towards trespasses, extra alertness and concentration in addition to picking up of the aspect of signals. Further operations of these trains require frequent stopping and starting at a stretch and needs special skill-set to cope up with maintaining punctuality. And in case of troubles, to attend the same the Motorman should have up-to-date of knowledge, quick reflexes within a short time. At the time of turn back services, Motorman has to wade through the on rush of commuters
to avoid delay which increases stress on his part. In the present system of working, pre-clearing of signals in case of stopping for EMU trains is susceptible for error as he is alone in the cabin. In real situation prevailing in suburban sections of Indian Railways, the Motorman driving the suburban trains has encountered in one shift 382 stop signals, 79 pinpoint halts, 30 to 45 speed restriction and encountered 70 to 75 whistle boards and in a week they have to encounter run over of human beings and observing signals in every 16 seconds, stop and start every 2 to 3 minutes in a span of 7 to 8 hours duty. Such is the taxing situation the Motorman works, that to alone in the cabin.
In concern with Motorman in underground Railway (Metro), in detail justification for increasing their pay based on their special working is given in Annexure D which may pleased be referred.
The above said factors which are exclusively present for Motorman in
EMU services alone justify him to get better and just pay.

SUBURBAN WORKING

Suburban working in Mumbai, Kolkata and Chennai is unique one. For eg. In Mumbai almost 2300 trains (CR and WR) are run per 24 hrs. and therefore their services should be properly evaluated in terms of grades and other allowances.
When the Railway has started suburban services, it was only up to Mumbai-Kurla and Mumbai – Bandra (15 kms), but now in view of increased traffic and demands, suburban services are required to be redefined. Computation of kilometerage should not be at par with the other passenger carrying train Loco Pilots.
The computation of mileage to the suburban services should be based on trip system with minimum of 160 km per hour and the longer distance trip should be
10.

minimum three times the actual distance. The waiting duty of suburban staff should be 40 kms per hour.
It is observed that in the double set of duty Motormen are required to occupy the Running Room for 3-5 hrs. but due to deteriorating condition of Running Room, the Motorman is not practically getting peaceful sleep and therefore his tiredness overpowers him, therefore, it is submitted that the night duty should be counted for payment – half of what he is actually taking rest


L MONY
Central President,
AILRSA


Copy to

1. Exe. Dir. Pay Commission-II, Railway Board, Convener.
2. Exe. Dir. Finance (Estt), Railway Board, Member
3. Exe. Dir. Traffic Transportation (M) , Railway Board, Member
4. Exe. Dir. Mechanical Engg. (Tr) , Railway Board, Member
5. Exe. Dir. Elec. Development, Railway Board, Member
6. Exe. Dir. Civil Engg. (G) , Railway Board, Member
7. Exe. Dir. Establishment(N) , Railway Board, Member
8. Director, Pay Commission-II, Railway Board, Member
9. Two Members each from AIRF and NFIR, Member
10. Chairman, Railway Board

Monday, February 16, 2009

Minutes of CWC meeting which was held on 07.02.2009 in AILRSA Bhawan / Ghaziabad.

As notified, after our rally on 06.02.2009 in Delhi, the CWC meeting was held on 07.02.2009 which reviewed the execution of our last programmes, the attitude of Railway administration to ward our grievances and the Organizational positions and took the following decisions: -
1. A resolution is adopted authorizing Com, Jit Singh Tank our Central treasurer to operate the accounts alone because of death of Com, S. K. Dhar.
2. A delegation of our representative will meet the leaders of all the political parties and seek their support to our movement.
3. The convention should be held in the areas which are not covered by the national convention.
a) N. E. Railway should call their extended Zonal Committee meeting. It is decided to be held on 28th Feb’ 09 at Gonda.
b) E. C. Railway should organize convention, following by rally if possible and the same has been decided on 26th Feb’ 09 at Danapure.
c) N. F. Railway will hold the convention followed by extended ZWC at NJP on 18th Feb’ 09.
d) Efforts should be made to organize N. C. Railway, N. W. Railway by the comrades who are nearby and in the contact of Loco Running Staff of those Railways.
4. it is decided that from 1st March 09 to 15th March 09, all the Loco Running Staff should not work breach of rest at HQ and outstation and also on long hours as per rule. The extract of rules is enclosed herewith. The committee at the different levels should counsel the loco Running Staff about the concerned rules and its application.
The concerned committee and responsible comrades should keep a watch on the programme and report about its execution and its effect on working in our extend CWC meeting at Chennai on 25th / 26th March 2009.
5. At all the levels, Action committee is to be formed to guide the movement.
6. Build up the struggle fund as decided earlier.
7. Member Ship to be completed and statement along-with Central quota to be deposited by the end of Feb’ 09.
8. The ZWC of C. Railway should immediately sit and take a final decision on Central BGM.
9. Meeting of the extended CWC to Br. Secretary will be held at Chennai on 25th / 26th March 09 to take a stock of the situation and decide future course of action.



Com, no doubt the Delhi programme on 6th Feb’ 09 was a historical and unique program in which about 8000 Loco Running Staff have participated with a great enthuse which no doubt could draw the attention of Railway Administration. Now the need is to consulate the strength and organize further where we have no organization keeping in mind that a serious action is must to get justice.

A delegation consisting four members i.e. my self, Com, L. Mony our president, Com, D. Yadav, Secretary / Motor man Association, W. Railway and Com, S. K. Goutam (ALP) met CRB and discussed the issue for about 20 to 25 minutes.in a cordial atmosphere. CRB has told us that a departmental committee has been constituted and the matter is being discussed. However, we should not be ellusioned but go on a serious preparation for strike, if the situation so warranted.

A delegation led by Secretary General and President also met with Sri. A. K. Anthony Hon’ble minister for defense, who presently looking after the Job of PM also and handed over a memorandum who assured the delegation to send the memorandum to M.R.

Com, I was invited by IRLRO in their central BGM, was held at Jodhpure on 9th / 10th Feb’ 09 and I had attended. I made an open appeal to the delegates and leadership to come back in their own old house unifying the Organization under the banner of AILRSA which is the need of time, they said to communicate their views later but my call of unity impressed the delegates very much and also cadres are creating pressure on the leadership for unifying the Organization. The leadership is now forced by the own cadre to rethink and discuss the matter in the CWC and take a suitable decision. Very shortly most probably on 15th March they will sit in their working committee meeting for a decision.






M. N. Prasad, Secretary General
Note:

1. The rule on duty hours is attached herewith which should thoroughly be read and its implication and interpretation be understood before its application.
2. At some places, the relieving the Crew on 10 Hrs. working from signing on is in practice, you may go on that but when insisted to work further, go by the rule which is attached herewith.
3. HOER speaks for rest
a) rest at HQ: -
For duty of less than 8 Hrs. – 12 Hrs.
For duty of 8 Hrs. and more – 16 Hrs.
b) rest at out station
For duty less than 8 hrs. – 6 Hrs.
For duty 8 Hrs. and more – 8 Hrs.
For duty of less than 5 hrs. – Equivalent to the hour’s duty performed + one hour.






Office of the
Chief Operation Manager / CRB

No. 3DY / 10 / Long Hrs / Ft. II dated: 16.08.09

The Divisional Railway Manager,
South Eastern Railway
KGP, KUR, WAT, CKP, ADA, SBP, BSP, KGP

Sub: Duty at stretch of running staff.
Ref: Board’s advise vide their letter HO. E (LL) / 91 / HER / 1 – 11 dt. 13.4.92 in suppression of all pervious instructions of the subject

&

This office letter No. SFY/10/long Hrs/Pt. II dated 12.05.92

Please refer to this office letter No. even dated 12.05.92 regarding duty at stretch of running staff. it has been brought to the notice of the HOD that the instruction contained in that letter are not being observed by the divisions. Therefore, these instructions are being reiterated for religious observance by the divisions.

a) Over-all duty at a stretch of running staff from signing on should not exceed 12 hours and they should be entitled to claim relief thereafter.
b) Further, the running duty at a stretch should no ordinarily exceed 10 hours from the departure of the train and staff should be entitled to claim relief thereafter.
c) In operational exigencies, the running duty may be extended beyond 10 hours within overall limit of 12 hours provided due notice has been given to the staff by the control before completion of 8 hours of running duty.
d) If a train does not reach within an overall 11 hours of 12 hours the normal crew changing point / destination of the train/or the place where a relief has been arranged and such point 10 approximately 1 hour’s journey away the staff shall be required to work upto that point.
e) In exceptional origencies of accident/flood/agitation/equipment failures the staff may be required to beyond the limits prescribed above. In such camel the controller should suitably advise the staff.

Board desire that the above instruction should followed rightly, and it should be ensured that excising duty hours of running staff are avoided. In order to effect to Board’s instructions as indicated above, the following measure should be taken with immediate effect.

a) Train by train monitoring must be instruction and whenever it is apprehended that running staff also be required to perform more than 10 hours of traveling duty to a maximum 12 hours of total duty they must be given due notice before completion of 8 hours of running duty.
b) All control offices will maintain a register in which “Signing On” time of crew and departure time of train should be recorded. If for any running crew in unable to complete the assigned journey within 10 hours of the departure of the train, and within 10 /12 hours of “Signing On” the reason for exceeding the time limits must be recorded in this register. The time at on which crew was given notice in terms of para “a” above must be recorded in the register.
c) A daily statement of cases of excessive duty hours along-with reasons statement of cases of excessive duty hours along-with reason thereof, must be prepared by the control office and put up to the power and operation officers on the subsequent law for review. The statement shall be prepared by the Chief TLC / Chief DPC consultation with the Chief Controller.
d) DRM / ADRM shall review cases of excessive hour on a weekly basis.




e) At the end of each month, a monthly report should be sent by the 10th of the following month (in exe Performa enclosed herewith) by the DRM / ADRM to the Railway Board copies to COM, CMR & CEE.




Please acknowledge receipt of this letter.


(S. S Gehlot)
Dy. Chief Operations Manager
Chief Operating Manager

Friday, February 13, 2009

Due to the traffic conjunction at Bangalore city railway station a second terminal was opened at Yeswanthpur, but again it become inevitable to open another coaching terminal. Baiyyappanahalli(BYPL) was chosen as the best option. So it becomes necessary to shift the existing goods yard and maintenance centre to SGT.

The crew depot at Baiyyappanahalli also required to be shifted. The labour organisations put forth their suggestions with justifications to shift the crew depot to Krishnarajapuram.(KJM)

The advantages of maintaining a crew depot at KJM

1. KJM is a centre place of goods operation in Bangalore division-ie Chennasandra, Yelahanka, Yeswanthpur,and Bangalore city.

2. Loco Pilots and Assistant Loco Pilots are residing in the railway quarters at YPR, YNK, BNC, SBC, BYPL and private accommodations at Krishnarajapuram, Sevanagar, Baiyyappanahalli and many parts in and around Bangalore. Their children are put up in Central school or private Schools at Bangalore city area. Presently many are plying to and fro from residence to Crew booking BYPL by two-wheeler, since the public transport system at Bangalore is unsatisfactory. During night hours those who are arriving at BYPL preferring to stay in running room BYPL and start in morning hours due to the threat of thieves and dogs. A number of incidents were reported by our colleagues about the attack by miscreants during night hours. Because of this problems many private companies arranging vehicles to pick up and drop their workers during night.

3. Almost all express trains having stoppage at KJM. So it is more convenient for the staff to report and back to residence till around 00.00 hours.

4. SGT is a place located away from the residence of all the workers. Very few trains are stopping at SGT. Due to unloading of Cement and fertilizers the atmosphere is highly polluted and unsuitable for residential area.

5. No facilities provided for an ideal crew booking depot at SGT at the time of shifting.

6. Railway Hospital, Railway Schools, sufficient number of railway quarters is also necessary. A running room with three star facilities as recommended by Jusice Khanna committee to be opened.

7. A number of trains are originated, crew changing and terminated at KJM, CSDR, YNK, YPR etc . Asking the crew to repot to SGT for signing off and on is wastage of man power.

All these points were discussed with the divisional railway management and organized labour and came to a consensus to have a crew booking at KJM. But unfortunately Chief Operations manager was adamant to shift the Crew booking to SGT. Against this a family Dharna also was conducted by all the trade unions. But later the leaders of the recognized unions were misguided by the administration and taken their consent and on 9th February the shifting was effected. Hearing this unilateral decision staff was agitated and many were reported sick.Around 40 Loco Pilots and ALP repoted Sick and 26 goods train cancelled or put backed. By hearing this AILRSA and SWRMU office bearers tried to communicate and defuse the issue.

During this time, around 06.30 hours Senior Divisional Mechanical Engineer, Sri Govind Pandey called the General Secretary of AILRSA through mobile phone and threatened “I will see that You will be removed from service ….”. He directly threatened many other loco pilots at Baiyyappanahalli also.

We never expected such irresponsible statement from a learned officer who supposed to do needful step for negotiation and solve the issue. Instead he was adding fuel to the fire.
up to 12.oo hours the concerned officers not initiated any negotiation. So the Loco Pilots of SBC depot, LP Mail and LP pass also reported sick supporting the BYPL comrades. SWRMU come forward to support this movement. But NRMS/BMs directly propagate against the agitation.

Later DRM called AILRSA and SWRMU for negotiation along with Sr DME and some settlement arrived.


AILRSA organised a RailBhavan March on 06.02.09. since permission for conducting a rally proposed from Ram Leela Maidhan is cancelled by the Government the Dharna was conducted at Janthar Manthar. But the space provided was very insufficient due to the mass participation by the running staff. Around 2500 running staff participated. Com. Basudeb Acharia MP, Sri Rathod BJP MP, Com. Kanai Banerjee secretary CITU etc addressed.

Tuesday, January 27, 2009


AILRSA conducted REGIONAL CONVENTION at Hotel New Krishna Bhavan, Sampige Road, Malleswaram, Bangalore on 23rd January 2009. In which Southern Railway (Kerala and Tamil Nadu) and South Western Railway (Karnataka) participated.
Welcome Address given by Sri. C. Sunish, General Secretary, SWR ,
Presided by Sri KC James, General Secretary , SR,and
was inaugurated by Sri . VJK Nair, All India Vice President CITU
The following were addressed
Sri. PS Prasad, General Secretary, COC, Karnataka.
Sri. L Mony, Central President, AILRSA
Sri. KAS Mani, Central Vice President, AILRSA
Sri. N Sarkar, Working President, AILRSA
Sri. S Prasannakumar, President, NREU
Sri. R Murali, Zonal president SR
Sri. Parthasarathy, AILRSA Chennai
around 250 delegates attended. The meeting decided to make the Rail Bhavan March a grand success and if the issues are not settled to go for INDEFINITE STRIKE from any day after April 1

Vote of Thanks: Com.A. Jayachandran, Zonal Working President, AILRSA,
Future Programs:
Mass Rally and Dharna before Rail Bhavan on 6th Feb. 09.
If the demands are not redressed, we may forced to enter in to INDEFINITE STRIKE Any Day after 1st APRIL 09, duly serving strike notice as per ID Act

Sunday, January 18, 2009

Venue changed for the regional convention of the Central & Western Railway from Mumbai CST to Railway Institute THANE (West)on date 19TH January, 2009 at 15.00 hours, The Convention will be followed by the press conference. Shri Haribhau Rathod (MP), AILRSA/CWC members Com M N Prasad, Com L Mony, Com N Sarkar, Com T Hanumaiah, will address the convention. AILRSA leadres from Central & Western Railway and Leaders of Western Railway Motormen Association will also address the convention.
1. As per CWC direction , AILRSA Howrah TRS Br. observed 30Hrs. Sit in Fast program from 10Hrs. on 29/12/08 in front of DRM Office Howrah, inviting all Railway and other democratic Trade Unions .

Com. M.N. Prasad- Acting Secretary General inaugurated the program

30 comrades took parts in Sit in Fast and about 250 Asst. Loco Pilots, Loco Pilots including family members were present all along to success the program.

Com. N. Sarkar, Central working President, Com Mukunda Banerjee, Secretary AIREC, SE Railway along with other representatives of ERMU, ERMC, AIGC addressed the meeting. To encourage the fasting loco men, local MLA Com. Lagan Deo Sing extended all possible co- operation for the success of program
.
Honb’le Mayor of Howrah Corporation Smt. Mamta Joiswal also addressed the meeting.

On 30th Dec, at 16.00 hrs. Honb’le Member Of Parliament COM Santosree Chatteerjee offered lemon water to the fasting comrades to break fast and also promised to raise the issue of AILRSA at the Parliament level in the next session of Parliament.

Local News Paper and TV journalists also covered the program.


2. 14th BGM of AILRSA Howrah TRS Branch held at Seminar Hall , CC office Howrah on 10th January 2009

At the out set, Red flag of the Organization hoisted by the branch president , garlanded the photo of Com. S.K. Dhar ,observed one minute silence in memory of departed comrades.

Com. S.C Majumder , out going secretary , placed report covering all International , National situation , creticised the role of 6th CPC for not considering the working condition , risk and hazard while fixing pay and other allowances of Asst. Loco Pilots and Loco pilots .

Com. N. Sarkar Central working President inaugurated the meeting and narrated the view point of Organization.

Com Mukunda Banerjee Secretary AIREC, SE Rly. reminded the glorious history of AILRSA and call upon to build up organization in the line of Unity and Struggle to fight against the minace.
Strong Body of 23 Members with President as Com.R.B.Yadav and Secretary Com C.K. Sarkar elected unanimously.
Circular No: 1/2009



1. It is to inform you that accommodation for 6th Feb’ 09 programme is arranged for 5th and 6th Feb’ 09 in Ambedkar Bhawan, Rani Jhansi Road, New Delhi 110055.

2. It is once more requested to remit Rs. 5000/- as levied for this programme without any further delay, the Railway whose has not paid as yet.

3. The CWC meeting will be held on 7th Feb’ 2009 from 10 Hrs. in AILRSA Bhawan, Ghaziabad to decide our next course of action.

4. The statement of M / Ship and Central quota must be brought and deposited to Center by 7th Feb’ 2009 i.e. the date for meeting of CWC.

5. All participant in 6th Feb’ 09 programme will come in uniform.



Hope the new years will be a year of success.




(M. N. Prasad)
Secretary General

Monday, January 12, 2009

UNITE TO FIGHT OUT INJUSTICE

Resist new Running Allowance rates which allow Rs.7.50 as TA for a day for RC and any other Training.Rs.68/- as TA in a month for working trains all the 365 days for Loco Pilots.

While this Association is on the serious agitational path against the deeply depressed pay structure of Asst. Loco Pilots, the release of report of the committee under Chairmanship of Adv (IR) RBE 202/2008 regarding pay element and rate of Running allowance come like “Bolt from the Blue”
As per RBE 202/2008 orders the rate of Running allowance for LP (Pass) is derived as Rs.169/- and Rs 121/- for ALP the committee says.
• Though every reason exist to reduce the pay element even after IV and V CPC by considering the Running staff productivity is more important, if an attempt is made to reduce the pay element basing on depression concept will ultimately lower the motivation level and in turn affecting the efficiency in train operation.
• Assuming TA revision as Rs.210/- and taking minimum of pay band Rs. 9300 + GP Rs. 4200,arrived the rate at Rs.160/-and decided not to continue the RAC 1980 formula and concluded Doubling of mileage rate with effect from 01.09.2008.
Continuously and vigorously our Association is strongly advocating against the ‘depression concept’ for arriving % of pay element. The same is accepted by the committee only because of our united struggles. But RAC 1980 clearly devised a formula to determine the rate of Running Allowance, accordingly for the past 28 years periodical revision of rate of Running Allowance has been taken place basing on the varying parameters of the formula despite our reservations on the parameters.
The newly coined depression concept by RAC 2002 on selective and convenient comparison to suit to their ill intention without considering the nature of work, duties and responsibilities of Loco Running Staff and that of other Non-Running Staff only been taken by Adv(IR) committee, but deliberately ignored the enhanced number of days of TA and real time data on NAK(4700km).Further this committee has taken minimum of PB 2 ie.Rs.9300+GP Rs.4200,wherein which no LP(Pass) draws Rs.9300 as pay in pay band is unjust and intended to reduce the pay of Running staff. Loco running staffs are given just replacement scales, in order to retain the relativity with others, mean pay concept need to be continued. (ie) Rs.22050 + GP Rs.4200, contrarily taking minimum of pay in PB 2 and taking TA rate as Rs.210/-whereas the revised new TA rate (Rs.340/-) to determine the rate of Running Allowance as double will not meet ends of justice. If the new rates are allowed to continue, we will not get any compensation for the outstation stay while all others will enjoy.
The mean of pay of Loco Pilot (Pass) is {(9300 + 34800) / 2} + 4200 = Rs 26250/- The 30% pay element is Rs.7875/-.The national average killometerage of passenger link is 4700.So the average running allowance of Loco Pilot (Pass) is {(169*4700) / 100} = Rs.7943/- ie the TA component is 7943 – 7875 = Rs 68/- ?!!!.....
Similarly the pay element for a day is 7875/30 = Rs.262.50.ALK for LP(Pass) is Rs.270/-.He will get Rs.7.50 as TA when attending RC / Promotional course while all others with same grade pay will get Rs.340/- as TA. Very same ill fate is shared by ALPs in Passenger links. The ill fate of LPs and ALPs working in Goods need not be spoken. None of them will get their actual pay element even!! No arrears pay element from 01. 01. 06 to 31.08.08 will be paid to us. This will become a penalization for maintaining the higher medical standards and continue in the most tedious duty as the medically decategorised running staff will get the arrears.
Rather to correct the infirmities in the RAC 1980 formula, but abolishing the time tested formula which we got after waging continuous struggles on scientific revision of Running Allowance will pave the way for the loss of periodic revision and lead to include the Running Allowance system under PRIS (Performance Related Incentive Scheme as suggested by VI CPC).Let us not fall prey to evil design
This Association’s continuous and tireless efforts and struggles had drawn the attention of Ministry Of Railways to spell out to redress the grievance of Asst. Loco Pilots grade pay. Let us grab this opportunity to rigorously continue our agitation programs to achieve our following demands

1. Upgrade ALP grade pay to Rs.2800/-
2. Allow enhanced distinct GP for LPs
3. Extend additional allowance to all LPs and ALPs
4. Revise rate of Running Allowance as per RAC 1980 formula.
5. Appoint judicial review committee on HOER

Let us join hands and uphold unity of Loco Running men to achieve our righteous pay and allowances

Muster our strength to Regional Conventions and Rail Bhavan March on Feb.6th 2009
Forget who raised the injustice first or
Signed in agreements – Let us unite to fight out the injustice

Thursday, January 8, 2009


on 06.01.09 while working Train no. 6210 Mysore -Ajmeer Express at Ramanagaram railway Station agitated passengers of 238 Bangalore-Mysore Passenger Train pelt Stones to the Train Engine and Coaches. Since the passenger train was detained for crossing the Ajmeer train they adopted such a bad practice. Due to the stone throw the Loco Pilot Sri K Imayavaramban and Assistant Loco Pilot Sri Venkoba Rao were INJURED, and undergoing treatment at Railway Hospital Bangalore. Such incidents are repeating now a days . So to stop such incidents the Loco motive to be provided with Metal Gaurds, and necessary RPF protection may be arranged where ever required. AILRSA strongly protest this type of practice by the passengers. The crossing of trains are not decided by the Loco Pilot. If at all they are having a protest they can very well stop the trains and discuss with the Divisional Railway Manager and other othorities and not to put their anger on the POOR WORKERS.
REPORT OF HUNGER FAST AT MYSORE
AILRSREPORT OF HUNGER FAST AT MYSORE
AILRSA Mysore division conducted a Mass hunger fast infront of Divisional Railway Manager office , Mysore on 07.01.09 . The program was inaugurated by Sri C. Sunish, General secretary, AILRSA, SWR and addressed by the following
1. Sri A. Jayachandran, Zonal working President AILRSA
2. Sri PK Sahoo. Joint Secretary, AILRSA SWR
3. Sri. KN Rao, Zonal Vice President NRMS
4 Sri Gopalakrishna pillai, Working President SWRMU
5 Sri R Nagaraj, Div President NRMS
6 Sri Noor Mohammed, Div Secretary SWRMU
7 Sri R Surendran Div Secretary AILRSA Bangalore
were attended and they stressed the need of joint fight agiast the adverse recommendation of pay commission particular to Running staff.
a representation comprising of Sri C.Sunish, Sri MR Jayaram and Sri BN Singh met Divisional Railway Manager Sri Vijaya Raghavan and submitted a memorandum.A Mysore division conducted a Mass hunger fast infront of Divisional Railway Manager office , Mysore on 07.01.09 . The program was inaugurated by Sri C. Sunish, General secretary, AILRSA, SWR and addressed by the following
1. Sri A. Jayachandran, Zonal working President AILRSA
2. Sri PK Sahoo. Joint Secretary, AILRSA SWR
3. Sri. KN Rao, Zonal Vice President NRMS
4 Sri Gopalakrishna pillai, Working President SWRMU
5 Sri R Nagaraj, Div President NRMS
6 Sri Noor Mohammed, Div Secretary SWRMU
7 Sri R Surendran Div Secretary AILRSA Bangalore
were attended and they stressed the need of joint fight agiast the adverse recommendation of pay commission particular to Running staff.
a representation comprising of Sri C.Sunish, Sri MR Jayaram and Sri BN Singh met Divisional Railway Manager Sri Vijaya Raghavan and submitted a memorandum.

Sunday, January 4, 2009

Quarterly Report of the Activities in Western Zone
Dear Comrades,
On behalf of the AILRSA – BCT division – Western Railway I hereby wish all of you a very Happy New Year 2009.
If we look into the recent past we have been fighting to save our hard earned rights and privileges like the Pay Element and the Running Allowance rates, etc. And, the fight for right is still to be continued in the New Year as we have not achieved our goals of getting – proper Grade Pay, revised Mileage rates as per the correct formula and that too we must get it with arrears from 01.01.2006.
In recent past we have taken up several agitational programs for our grievances and justified demands and we have got success at the Divisional Level on resolving many of our local grievances.
1. The protest at DRM-BCT and GM-CCG on 6th October, 2008 against the illegal curtailment of Pay Element was successful and the running staff got the justified Pay Element as a result of the show of strength of unity.
2. After the demonstration at the DRM-BCT on 22nd October, 2009 our delegation (A. K. Shrivastav, Z. A. Shaikh, Ramdas G. D. and Mahesh Pandya) submitted the memorandum on the local and all India issues and got assurance from ADRM-BCT and Sr. DEE (O) BCT to immediately take up the issues of – providing CUG SIM Cards and Duty Card Passes to each and everyone of the Loco Running Staff, filling up all the vacancies in the entire Running Staff cadres.
3. Meeting of the Loco Running Staff was organized at Valsad to discuss about the further agitational programs and the local grievances.
4. Joint Meeting of the Loco and Traffic Running Staff was held at the Railway Institute Maninagar (Ahemadabad) on 9th November, 2008. Total 127 Running Staff attended the meeting. The Meeting was addressed by Comrades – A. K. Shrivastav, B. L. Shrivastav, J. A. Misquetta, R. D. Pillay, R. B. Khalsa and others. It was decided to increase the intensity of our agitational programs to achieve our demands.
5. After the demonstration at GM-CCG WR on 11th November, 2008 the delegation (A. K. Shrivastav, Dilip Kumar, Z. A. Shaikh, Tukaram Metry, Kamlesh Kumar, B. L. Shrivastav and Mahesh Pandya) submitted the memorandum on all India issues to the AGM, CME, CPO (IR), CELE, COM and other zonal officers.
6. The AILRSA whole heartedly supported the Work to Rule agitation by the Western Railway Motormen's Association which started from 1st December, 2008 till 6th December, 2008 when the administration gave them the assurance to look into the matter at the earliest.
7. After the demonstration at DRM-BCT on 2nd December, 2008 our delegation (B. L. Shrivastav, A. K. Shrivastav, S. P. Sharma, Ajit Singh, Tukaram Metry and Mahesh Pandya) submitted the memorandum on the local grievances & demands and reminded the officers ADRM-BCT, DPO-BCT and Sr. DEE (O) BCT to immediately take up the issues of – providing CUG SIM Cards and Duty Card Passes to each and everyone of the Loco Running Staff, filling up all the vacancies in the entire Running Staff cadres, and also take up the issues of Pay Fixation & Payment of all kind of Arrears as quickly as possible.
8. Our comrades attended and supported the Hunger Strike Agitation by the Western Railway Motormen's Association on 18th December, 2008 as the administration denied their justified demands.
9. Demand Day was observed as per the CWC guidelines by wearing of protest badges while on duty on entire Western Railway network. And, holding the meeting of Loco Running Staff at crew points was observed at Valsad, Ratlam and Chittaurgarh.
10. Our Comrades Ramdas G. D., Milind Datar, Sanjay Kulkarni, Mahesh Pandya and P. K. Dhote attended the AILRSA Mumbai Divisional Central Railway's Conference at Kalyan on 27TH December, 2008 and discussed in detail about mobilization of the Loco Running Staff against the injustice done by the 6th CPC.
11. On 29th December, 2008 the program as decided by the CWC of AILRSA was to hold 36 hours Hunger Strike in front of All the DRM offices but as per the decision by the Divisional body of Mumbai Division AILRSA it was decided to hold Hunger Strike at the ARM-BL and peaceful demonstration at the DRM-BCT. After the demonstration our delegation (Milind Datar, Tukaram Metry, Ramdas G. D., Mahesh Pandya, Pradeep Tiwari, Saiyad Ahmed) submitted and discussed in detail about the all India Memorandum regarding Grade Pay and Running Allowance to the DRM-BCT. And, the delegation pressurized the Sr. DEE (O) BCT to take immediate steps regarding filling up all the vacancies and release the promotion letters which were pending for orders.
12. At Ratlam on 29/30TH December, 2008 the Hunger Strike program was observed for 30 hours in front of DRM office Ratlam Total 392 Loco Running Staff participated in the agitational program and this was covered by the Press and the Media.
13. Meeting of the Loco Running Staff at HQ Vasai Road (Mumbai Division) was organised on 31st December, 2008 and a new Adhoc Body was constituted for AILRSA Vasai Branch.
14. Programs to be hold in near future are (A) Conference of Central Zone AILRSA at Bhusawal on 2ND January, 2009. (B) Divisional Meeting of Kota Division at Gangapur City on 3RD January 2008.
Comrades, we have got a message from our Secretary General Shri. M. N. Prasad and I am putting it as it was received on mobile handset for your information and necessary action please.
“Our all India program of 29/30th was so effective that we could be able to draw the attention of Railway Minister who learnt to be asked CRB to look into the Grade Pay of Assistant Loco Pilot. Prepare strongly for 6th February without being illusioned.”

Friday, January 2, 2009

ALL INDIA LOCO RUNNING STAFF ASSOCIATION



Regd.No : 17903 H.Q. A N A R A


Good News in the New year

AILRSA welcomes the statement of the Minister of Railways


The consistent efforts of AILRSA and its programmes, in particular the 30-hrs hunger fast programme 29th & 30th Dec’ 2008 has a telling effect on the MINISTRY OF RAILWAYS in recognising the injustice caused to the locomen in the 6th CPC, particularly to the ALPs.
As a result, in a farewell meeting, the Hon’ble Minister of Railway, Shri Lalu Prasad Yadavji has openly directed the Chairman, Railway Board to redress the grievances of the Asst. Loco pilots. He was categorical that their grades must be restored with commensurate pay scales, as these personnel are performing a vital job.
While welcoming the statement of the Hon’ble Minister of Railways, Shri Lalu Prasad Yadavji, the AILRSA requests him to implement his order to increase the grade pay of ALPs/Locomen expeditiously.
AILRSA appeals to all locomen to come together and participate in all the programs of AILRSA, in order to achieve our genuine demands.
@ @ @

Thursday, January 1, 2009

Dear Comrades,
AILRSA has conducted 36 hours Hunger fast in front of Divisional Railway Manager’s office through out the country. At many locations different trade unions supported this agitation. Many Divisions train service were dislocated due to severe causality. As a result small spark has came in the form of instruction from our Honarable Railway Minister Sri Lalu Prasad Yadav, who asked Sri KC Jena, Chairman Railway Board as follows

THE HINDU
Online edition of India's National Newspaper
Thursday, January 01, 2009


Reduction in fares
Mr. Prasad, however, ruled out lowering passenger fares in the wake of a reduction in fares by air operators and cut in diesel prices. “They had hiked the prices in the first place. We did not hike the fares when the price of diesel was raised.”
He asked the Railway Board chairman K.C. Jena at the farewell function of seven railways staff to redress the grievance of the assistant loco pilots who struck work on Tuesday protesting against the recommendation of the Sixth Pay commission.
The Railway Minister was categorical that their grades must be restored with commensurate pay scales as these personnel were performing a vital job.

We should develop this spark to a mighty FIRE to destroy all the obstructions before us. Don’t keep any illusion that your demands are redressed. It is only IDENTIFIED by our Minister Sri Lalu due to the train detention during our Hunger fast on 29th and 30th in different parts of the country. So let us not being carried away by this, since the past history of Railway Bureaucracy is not so attractive in honouring the Judicial/ Political commitments and decisions.
So please continue our campaign rigorously to make the Rail Bhavan March on Feb 6 a grant success.

Sunday, December 28, 2008

RBE 202/2008 Slno.PCVI/65
E(P&A)II 2005/RS-34 Dated26.12.2008
Railway board hasreleased the RBO for mileage
LP Mail 170
LP Pass 169
LP Goods 168
LP Shr.Sr 130
LP Shr 126
SrALP 126
ALP 121

Pay element of 30%/55% will continue.

Effect given from. 01.09.2008.
This order to be resisted. Running allowanceis not an Allowancebut a part ofOur basic.Also RAC 1980 formula to be continued.

Tuesday, December 23, 2008

To,
Chairman
Railway Board
Rail Bhvan
New Delhi
Fax No. 011 23381453
Respected Sir,
Subject : - Demands Day by Loco Running Staff on 23rd Dec 2008
Members of this association are observing today – 23rd Dec. 2008 as demands day all over India by wearing demand badge on duty. Association took this decision to highlight the protest against the low pay scales allotted to loco running category when compared to the work load and responsibility shouldered by them.
The recommendations of the committee appointed by railway board to determine the quantum of pay element and running allowance rates are disheartening. The quantum of pay element in the existing rates for a new entrant assistant loco pilot is Rs.2319/- and for a loco pilot goods is Rs.4050/- and the 20 day’s T.A. is Rs.4200/- and Rs.6800/- respectively ie they should get Rs.6519/- and Rs.10850/- respectively through running allowance. For that an ALP should earn 5400Km and LP/Goods to earn 6500Km every month, which is an impossible task. When this be the fate of the Junior most ones, it is better not to speak about seniors having still higher basic pay.
So the ……………… branch of AILRSA represent their protest and once again request reconsideration on our demands to prevent an out burst of growing discontentment among the most vital category of staff in railways.

Yours faithfully,

Place : ……….. Secretary
Date : 23 – 12 – 2008 …………..Branch.
Dear Comrades,
You might be listening different kind of stories from different type of people about what happened at Churchgate on 18th December, 2008 when the Motormen of Western Railway went on the "Hunger Strike" agitation.
As far as the best of my knowledge and belief Motormen of the Western Railway were submitting their representations about their grievances and demands since 20th February, 2006 at almost all the level of Railway’s administration.
When all of their grievances and demands were neither properly heard nor there was any serious effort by any one of the Railway's administration to solve any of the problems then only the Motormen of Western Railway were frustrated and declared to start "Work to Rule" from 1st December, 2008 and then ultimately there was "Hunger Strike" on 18th December, 2008. Revolutionary Greetings to the Motormen of the Western Railway.
The Document attached herewith is prepared by the Western Railway Motorman's Association and is self Explanatory in all respect.
Mahesh N. Pandya
Loco Pilot (Mail) BAMY
Divisional Secretary - AILRSA - BCT/WR
Zonal Working President - AILRSA/WR
09322287069, 09004448515, 09224700989

Sunday, December 21, 2008

Program of Action

Observe 23rd Dec. 08 as DEMAND DAY

SIT IN FAST FOR 36 Hrs. from 29th Dec. - 08
Before All DRM Offices

Regional Convention
South and South Western Railway
At HOTEL NEW KRISHNA BHAVAN
Sampige Road, Malleswaram, Bangalore
On 23rd Jan 2009

Mass Rally and Dharna before Rail Bhavan
on 6th Feb. – 09

If the demand are not settled we may forced to enter in to

INDEFINITE STRIKE
Any Day After 1st APRIL – 09

Demands
1. Upgrade the Grade Pay of ALP to Rs.2800/-
2. Consider functional differences and allot distinct Grade Pay as follows
3. Allow 55%/30% pay element pending revision to 70%/60%
4. Extend additional allowance to all loco running staff.
5. Appoint judicial review committee on HOER as assured by Govt.

Friday, December 19, 2008

MUMBAI: The flash strike by motormen of Western Railway, which left thousands of suburban railway commuters stranded for over two hours, was finally

called off on Thursday night.

Suburban train services resumed shortly after 11 pm, after the strike was called off following discussions between motormen and railway officials, but not before angry commuters vented their ire, damaging property at some railway stations like Churchgate, Marine Lines and Andheri.

At Churchgate, hundreds of stranded commuters pulled down metal detectors and smashed glass panes of the booking office.

BEST operated additional services in view of the disruption of train services. Several commuters also opted for taxis to return home.

"Train services had come to a standstill at 9.20pm following the flash strike", Western Railway CPRO S S Gupta said. "The motormen gave a notice for hunger protest (strike) for today but there was no intimation about this strike", he said.

The motormen had refused to operate trains following the collapse of two of their colleagues during the day-long hunger strike. Over 300 motormen on the suburban line of the Western Railway (WR) participated in the agitation, demanding filling up of vacancies.

Around 9.20 pm, two motormen, apparently exhausted by the hunger strike, collapsed at Churchgate. Subsequently, other motormen stepped down from their duty following which all Up and Down train services were disrupted.
What Happens Actually
motor man of western railway went on ire and stopped the train service for 2.45 hours in peak hours, resulting in public anger.the motorman said that they were given notice one month before regarding an on duty hunger strike, but the DRM and the Sr.DEE(OP) neglected thier demands and not even permitted an elgible discussion. the demands were
1)crew link will be discussed with employees before implementation, not with the people of recoganised union, as these peoples blindly agreeing to administrations decission
2)Reduce average working KM / Day and make it less than CR or equivalent to them
3)Victimisation of motormans to be stopped immediately on silly and unwanted matters
4)one fellow victimised should be taken back without serious action
5)6th pay commission to be implemented in proper way as done in other places
6)demanding a grade pay of rs 4600/- to motormans
these demands were given one month before, and as per the programme motormen were working doiing hungerfast, and two of the members collapsed.even after that the adament & arrogant administration refused to talk constraining the motormans to take the deadly decision of stopping the train. and the drm & sr.dee(op) discussed with them agreeing the first five demands and recommending rly board to implement the 6th decision

Sunday, December 14, 2008

Employees' Pension Scheme -
Oppose Arbitrary Reduction of Benefits, Demand Improvments
- W. R. Varada Rajan
The Employees’ Pension Scheme (EPS) was introduced in 1995 as an additional scheme under the Employees' Provident Fund Miscellaneous Provisions Act, 1952. A fierce debate preceded the enactment of legislation in Parliament in this regard. The CITU and some other Left Trade Unions had demanded Pension as a third benefit and pointed out the inadequacies and shortcomings in the EPS put forth by the then Congress Government at the Centre. However, the INTUC, BMS, AITUC and HMS had lent unqualified support to the EPS as brought out by the Government and justified such support with an ingenious argument that once the Scheme comes into vogue, improvements could be made subsequently. The Government on its part included a provision for annual valuation of the Employees' Pension Fund and also assured a comprehensive review after 10 years of introduction of the EPS.
The first four annual valuation reports brought out at the end of November 1996, March 1998, March 1999 and March 2000 had resulted in grant of paltry relief of 4 per cent, 5.5 per cent, 4 per cent and 4 per cent respectively. Thereafter, the annual valuation reports for the period from 2001 to 2005 incorporated an alarming picture of huge deficit in the Pension Fund, based on the assessment of growing contingent liability. Besides, the Employees' Provident Fund Organisation and the Ministry of Labour have been resorting to unilateral interpretation of the provisions of the EPS, adversely affecting even the grossly inadequate benefits contained in the Scheme. The Supreme Court verdict upholding the EPS 1995 had emboldened the Government to take drastic measures detrimental to the interests of the workers.
The Ministry of Labour had put forth several proposals for reducing the benefit-package under the EPS 1995. These proposals were opposed by the representatives of the central trade unions inside the Central Board of Trustees of the EPF. The Government of India attempted to push these proposals at the meetings with the representatives of the central Trade Unions held with the Secretary, Ministry of Labour on 21.4.2005, 21.6.2005 and 18.7.2005 and the Minister of Labour on 16.11.2006. In all these meetings, all the central trade unions had rejected these proposals and unanimously demanded that the contribution from the employers and the Government of India should appropriately be increased in order to grant improved pension benefits and index linked dearness relief to the pensioners.
The Employees' Provident Fund Organisation (EPFO) has constituted a committee to conduct a comprehensive review of the Pension Scheme. Besides, there is a Pension Implementation Committee under the CBT to continuously monitor the Pension Scheme.
But, the Governmnet of India had issued a Gazette notification (GSR Nos. 688 (E) dated the 26th September, 2008) incorporating several amendments They are:
1. Amendment to Para 12 (7).
2. Deletion of Para 12 A.
3. Deletion of Para 13.
These amendments have far reaching consequences by way of substantially altering the benefit package of the EPS'95 to the detriment of the interests of workers.
The first amendment to Para 12 (7) has increased the rate by which the amount of pension is to be reduced in the case of early pension (availed by those who have completed 50 years of age but are below the age of 58) from 3 per cent to 4 per cent. This will result in immediate reduction in the quantum of pension.
If for example, the eligible pension on completing 58 years of age is Rs. 1000 per month and the employee has to exit the job on completion of 50 years of age, either due to resignation, retrenchment, illness or otherwise, he would get an early pension applying a reduction of 3 per cent per year i.e. 24 per cent reduced from the monthly pension and would get Rs. 760 per month. This reduction rate has now been enhance to 4 per cent and in this case the reduction would be 32 per cent or the monthly pension would be Rs. 680 only.
The second amendment (Deletion of Para 12 A) is altogether eliminating the option available at present for commutation of pension. The existing provision enables a member to commute up to a maximum of one-third of his pension so as to receive hundred times the monthly pension. This facility was mad available after three years of commencement of the Pension Scheme i.e. from 16.11.1998 onwards.
If for example, the eligible pension is Rs. 1000 per month and the pensioner opts to commute one-third of his monthly pension the commuted value of will be equal to 1/3 x 1000 x 100 = Rs. 33333 and the same will be paid at the time of exercise of option for commutation. The balance pension payable on monthly basis will be Rs. 667.
This option for commutation is totally abolished now. The pensioner is thus denied the opportunity to commute one-third of his monthly pension and avail a lump sum amount to meet exigencies like marriage in the family, death of kin, medical expenses etc. The concept of commutation is a universal component of any pension scheme and this is done away with arbitrarily.
The third amendment (Deletion of Para 13) eliminates the existing option available to a member eligible for pension to draw reduced pension and avail a return of capital under any of the three alternatives provided. Unlike the option for commutation, the option for return of capital must be exercised at the time of applying for pension itself.
The three alternatives are:
i. A pensioner during his lifetime can opt to avail a revised pension of 90 per cent of original pension with return of capital equal to 100 times the original monthly pension on death of the member payable to the nominee.
ii. A pensioner during his lifetime can opt to avail a revised pension of 90 per cent of original monthly pension; the widow of the pensioner can opt to avail a revised pension of 80 per cent of original monthly pension on the death of her husband; the nominee of the pensioner can also exercise this option on the remarriage of the widow; In these case the return of capital will be equal to 90 times the original monthly pension.
iii. A pensioner can opt to avail a fixed pension for a period of 20 years notwithstanding whether the member lives for that period or not. Under this option the member can avail a 87.5 per cent of original monthly pension for 20 years and at the end of 20 years, avail return of capital equal to 100 times the original monthly pension.
All these three alternative options for availing return of capital have now been totally eliminated.
Besides these adverse changes in the benefit package under the Employees' Pension Scheme 1995, the notification incorporates an amendment to the table under the EPS revising the rates of damages to be levied from an employer who makes a default in the payment of contributions/charges payable as prescribed in the scheme.
The existing rate of damages and reduced rates are as under:
Period of Delay (Pre-revised) Rate of damages (As amended)
Less than two months 17 % 5 %
2 months & above but less than 4 months 22% 10%
4 months & above but less than 6 months 27 % 15 %
6 months & above 37 % 25 %
Such damages are levied under the Employees' Provident Fund (EPF) Scheme and Employees' Deposit Linked Insurance (EDLI) Scheme as well. The Government of India has issued two other Gazette Notifications (GSR Nos. 689 (E) to 690 (E) dated the 26th September, 2008) incorporating identical amendments to the tables under these two schemes as well.
These amendments arte intended to benefit the employers who are defaulting the remittance of contributions under these schemes. While on the one hand the Government of India has virtually abolished the inspection of establishments to do away with the 'harassment' of employers and has pledged to promote voluntary compliance, the penal element in respect of defaults in compliance have also been softened.
Only the subject of reducing the rate of damages was placed as an agenda item of the 181st, 182nd and 183rd meetings of the Central Board of Trustees (CBT), EPF held on 24.1.2008, 17.4.2008 and 5.7.2008. In the CBT, the agenda item was deferred on all the three occasions. A decision has since been taken on this deferred item of the agenda at the back of the CBT. This is highly deplorable.
While the first amendment to Para 12 (7), i.e. enhancement of the rate of reduction in the case of early pension, had been mooted by the Consultant Actuary and the Valuation Reports. But the other amendments had never been raised at any time before either in the meetings of the CBT or in the meeting of the Pension Implementation Committee. Moreover, these issues were not discussed in the meetings with the representatives of the Central Trade Unions, referred to earlier.
These arbitrary decisions have been given effect to even while a comprehensive review of the EPS' 95 is under way and the Committee set up for the purpose has held two sittings.
The trade union movement should vehemently protest over this unjustified move, which has rendered the statutory tripartite body of the CBT irrelevant and reduced the tripartite consultation mechanism in the Labour Ministry to a mockery.
Here it is also worthwhile to record here that a decision taken by the CBT after due deliberations at its 182nd and 183rd meetings for reduction of threshold limit for coverage of the EPF & MP Act, 1952, from the existing limit of 20 workers to 10 workers had not been given effect to. While the Ministry of Labour has chosen to maintain a studied silence over this decision, it has no qualms to decided with unseemly haste flouting all norms to impose adverse changes in the benefit package of the EPS' 95.
The trade union movement should demand immediate withdrawal of these Notifications and urge the Government of India to initiate a dialogue with the Central Trade Unions for bringing meaningful improvements in the Employees' Pensions Scheme like enhancement of the minimum pension bringing it on par with the minimum pension available under the central government pension scheme applicable to pre – 2004 recruits and provision of index linked dearness relief for the pensioners. For this, the contribution from the employers and the Government of India should appropriately be hiked.

Saturday, December 13, 2008

To,
THE CHAIRMNAN
Railway Board
Rail Bhavan
New Delhi

Respected Sir,
Sub: Recommendation of committee on Running allowance dt. 25th Nov. 2008.
It is learned that the committee constituted to decide the quantum of pay element and running allowance rate has submitted its recommendation. The recommendations of the committee that the existing quantum or pay element shall continue but running allowance rate shall be doubled abolishing the system of determining the rate of kilometerage on a long established formula which has been brought in Railways after a long and sustained effort of AILRSA is unjust and hence unacceptable to running staff. As the news of recommendation is spread amongst the running staff there is serous resentment among staff.
At the out set we appreciate the two conclusions arrived by the committee that the depression concept is no longer relevant vide Para 16 of their recommendation. Secondly the conclusion arrived in Para 9 and 10 that the running staff are crucial and vital to the running of the Railway and the fact that running staff productivity is critical to the IR so it is necessary that their motivation level is maintained at highest level, and upon the
implementation of the 6th CPC recommendation Teachers, Nurses, Section officers/ Sr. Section Officers of Account have been placed in the pay band which over shoots conventional Group “C” scales. Crucial categories like running staff have to be seen in relation to the difficulties, skill level and environment in which they work and running staff are distinct from all other Group “C” staff and their case has to be accordingly appreciated.
Basing on these conclusions the committee recommended to retain the existing percentage of 30% and 55% as pay element, through this Association and other recognized union asked to revise it upward to 60% and 75% giving justification for the same since 1981. the demand of the running staff may please be conceded in appreciation to their service to Railway.
Finding of the committee that in many cases emoluments of the running staff exceeds that of Group A officers is not the factual position. It may be true that the retirement benefit of running staff who are stagnated in the highest scale and drawing stagnation increment would have been reached to level of Group “A” in some cases but not in all cases, that too only on retirement benefit not on emoluments. This was so from the inception of Railway the reason for allowing higher retirement benefit was clearly spelt by the RAC 1980 and the finding of the III CPC.

FORMULA FOR WORKING OUT RATE OF KILOMETERAGE ALLOWANCE.
In this connection, we can not accept the recommendations of the committee. We are constrained to say that the whole concept of introduction of running allowance scheme by the railway is not fully appreciated or understood by the committee.
After all, the running staff should be paid the pay element according to the Basic Pay (pay band+ Grade pay) of the individual employee and TA/DA according to TA/DA rules. This is the minimum concept and is in accordance with basic rules.
But without straight away giving it, this has been paid through the scheme of running allowance. The RAC 1980 dealt the subject well. They recommended to take the mean of the scale as a compromise formula, otherwise different and distinctive rate have to be derived to different stage in pay scale as the individual employee is entitled for pay element according to his Basic Pay. Deriving different rate for different stage in Basic Pay is cumbersome and impractical. It may also be noted that while taking mean of the Basic Pay in fact, those who are in higher basic pay will loose and athose in lower pay benefited. If the minimum of pay scale is taken to arrive at the rate, the individual employee who draws higher pay will not get the actual amout or the pay element whch is statuory in nature. If the maximum of Basic pay is taken to arrive the rate, then uninteneded benefit will accure to those who are in lower levlel in the scale. That is why the RAC 1980 recommended taking the mean pay to arrive at the rate. It was an equitable decision. And staff not protested even though theree was a loss for those who draw higher pay in the scale.
The present recommendation to take the minimum of pay band be seen in this perception. Those who draw higher pay in the pay band will get a lesser amount of pay element, that too a very drastic loss. Pay of many running staff had been fixed in the band above 22,000/- and none draws at Rs. 9,300/- at present.
The observations made by the VI CPC to pay allowances with reference to minimum of pay in the pay band in Para 7.36.97 of it report were in the nature of suggestion/ illustration and this has modified through an errata and held that, the administrative ministry concerned will need to take a final view thereon.
Therefore the recommendation may be rejected and mean of the pay band & grade pay be taken to arrive at the running allowance rate.
The committee assumed the TA/DA has been released fixing at Rs. 210, but subsequently order of Railway Board on TA/DA has been fixed Rs. 340 should be taken as TA for fixing running allowance. Therefore the recommendation of the committee on running allowance to double the rate w.e.f. 1-9-2008 has to be rejected.
20 days TA/DA in the formulae may be revised at least to 25 days considering the present the present crew links/pattern of working.
According to the finding of the committee on bench marking, the national average kilometerage arrived was at 4700 KM. Therefore the average kilometer of Loco Pilot (pass) may be taken at 4700 KM and Assistant Loco Pilot be taken as 3700 KM to arrive at the running allowance rate.
We further wish to point out that the fixation of Loco Pilot (pass) whose Basic Pay as on 01.01.2006 at Rs. 5500 will be fixed at Rs. 11650+4200 GP i.e. at Rs. 15850. And TA of Rs. 105 was raised to Rs. 340 with an increase of 3.25 times. In the case of Assistant Loco Pilots the increase in TA rates is from Rs.55 to Rs.210 i.e. 3.81 times. Therefore the recommendations of the committee to double the rate of running allowance from 01.09.2008 have to be rejected.
According it is just to demand that the kilometerage rate of running staff be raised as follows:



Loco Pilot Assistant Loco Pilot


Basic Pay (9300+34800)+4200 (5830*+20200) +1900
2 2


Mean Pay 26250 14915



30% pay element 7875 4475


TA Rates 105 55

National average KM 5100 3725


Mileage rate 195.60 149.65

After TA revision w.e.f. 01.09.2008 with RAC 1980 formula

Basic Pay (9300+34800)+4200 (5830+20200) +1900
2 2




NewTA rate 340 210

Mean Pay 26250 14950

30% pay element 7875 4475




Mileage rate 287.75 232.90
In the light of the above facts, the recommendations of the committee need to be modified duly considering our demand for increasing the pay element to 60% / 75% and taking national average kilometer of passenger crew links as 4700 kilometers with 25 days TA.

Thanking you.
Yours’ faithfully


(M.N.Prasad)
Secy. Genreal

Friday, December 5, 2008

To,

The Chairman,
Railway Board,
Rail Bhavan,
New Delhi.


Sir,


Sub: Revision of running allowance to running staff.

It is learned that the committee constituted to decide the quantum of pay element and running allowance rate has submitted its recommendations. The recommendation of the committee that the existing quantum of pay element shall continue and running allowance rate shall be doubled is unjust and hence unacceptable to running staff.

The loco running staff is continuously protesting against the reduction of pay element from 75% to 30 / 55% in 1981. There were serious protest in fixing the national average kilometers and number of TA admissible.

Even if none of the demands of the loco running staff on the pay element and running allowance parameters are conceded, the rates will become as follows.

Existing formula suggested by RAC-1980 = {(30% Basic pay + 20 days TA) / National average KMs of Loco Pilot (pass)} x 100

Existing rate of running allowance

LP passenger = 83.80
ALP = 60.35

After pay revision w.e.f 01-01-2006



Loco Pilot
Mileage rate (9300-34800)+4200


7875+(105x20) X100 = 195.60
ALP
(5200-20200)+1900



4380+(55x20) X100 =147.10
3725


After TA revision w.e.f. 01-09-2008 with the existing formula


Mileage rate (9300-34800)+4200


7875+(340x20) X100 = 287.75
ALP
5100 (5200-20200)+1900


4380+(210x20) X100 =230.35


According to Bench marking orders as well as RAC-2002 National average KMs of passenger crew link is 4700 only. RAC-2002 agreed that number of TA admissible is 21 days.


7875+(340x21) X100 =319.45
4700
4380+(210x21) X100 =235.95
3725

Then the rate comes to,


We further wish to point out that the fixation of Loco Pilot (pass) whose Basic Pay as on 01-01-2006 at Rs. 5500/- will be fixed at 11650/- + 4200, that is at Rs. 15850/-. In other words the increase is 2.88 times. In light of the above facts the recommendation of the committee need to be modified duly increasing the pay element to 60%, taking national average of passenger crew links and 23 days TA.


Thanking you,

Yours faithfully,



cc: Union Minister of Railways,
Minister of state for railways,
Basudevacharya, M.P.
Member mechanic
Member traffic,
Member staff.

Welcome To AILRSA....

Visitors

Admin Area

Blog Archive

AILRSA 1970 - . Powered by Blogger.

Are You Satisfied with 7th Pay commission ?

Popular Posts

Recent Posts

Text Widget

Followers

-------------------------------------------------------

-------------------------------------------------------