To
Sri. Pradeep Kumar Saxena,
General Manager,
South Western Railway,
Hubli.
Respected Sir,
AILRSA 5th Zonal
Conference is held at Com. RS. Pandian Nagar, Rotary Centre, JLB Road, MYSURU
on 11th April 2015.
The Conference inaugurated by Sri.
AMANULLA KHAN, All India President, All India insurance employees association.
Sri. MN Prasad, Secretary General
AILRSA, Sri. T Hanumaiah Central Vice President AILRSA also attended the
meeting.
The meeting unanimously elected the
following members for the zonal committee .
POST
|
NAME
|
DESGN/DEPOT
|
President
|
SD Arnold
|
Retired LP UBL
|
Working President
|
R Surendran
|
LPM SBC
|
Vice President
|
Donal Raj
|
LPG CLR
|
Vice President
|
DS Niranjan
|
LPM SBC
|
Vice President
|
Nishad K
|
LPG SKLR
|
General Secretary
|
Ramesan K
|
LPP ASK
|
Joint Gen Secretary
|
Palash Ghosh
|
LPG HPT
|
Joint Gen Secretary
|
D Rajkumar
|
LPG SBC
|
Joint Gen Secretary
|
Sasi Kumar Nagappa
|
LPG MYS
|
Org. Secretary
|
K Rajesh
|
LPP BGM
|
Org. Secretary
|
KJ Renjith
|
LPG MYS
|
Org. Secretary
|
PAS Rao
|
LPM SBC
|
Treasurer
|
S Jagadeesan
|
LPM SBC
|
Asst. Treasurer
|
Suresh Kumar M
|
LPP ASK
|
Internal Auditor
|
MR Jayaram
|
LPP MYS
|
|
ZEC MEMBERS
|
|
1.UBL Depot
|
Rajaneesh Kumar
|
ALP
|
2.CLR
Depot
|
Bijoy Varghese
|
LPG
|
3.HPT Depot
|
CH Govinda Rao
|
CC
|
4.BGM Depot
|
Asok Xess
|
LPG
|
5.VSG Depot
|
Anurag MS
|
LPG
|
6.HRR Depot
|
BN Singh
|
LPP
|
7. JRU Depot
|
SK. Mahato
|
LPG
|
8.ASK Depot
|
Anand Kumar
|
LPG
|
9.SKLR Depot
|
Viswas P Karun
|
ALP
|
10.MYS Depot
|
Mahesh Kumar M
|
LPG
|
11.SBC Depot
|
V Krishnanand
|
LPG
|
12. SGT Depot
|
VV Suresh Kumar
|
LPG
|
The BGM has passed the following
resolutions unanimously.
1. VICTIMIZATION OF
STAFF IN THE NAME OF SPAD:
Members
of this union strongly believe that, administration is not taking sincere
efforts to protect their staff against false allegations of SPAD and is taking
partisan attitude in awarding punishments. There by their mere existence is at
peril and are trying to run away from running duties. As a responsible trade
union, we cannot keep quiet and warrant constructive action against such
injustices against staff. If the administration is going ahead with such
victimizations, we may be forced not believe on signals but work with extra
precautions in the interest of protecting our jobs. This fear of SPAD reporting
results in several inconveniences to travelling public. There is no mechanism put
in place to prove the innocence of loco pilot when a SPAD occurs. In several
cases Data Loggers have malfunctioned and stood as document to support the allegations
against the loco pilots. Your good office may know that the data logger which
is used against the loco pilot during SPAD is not a foolproof mechanism. We
request your good office to do needful to stop such victimizations to instill
confidence in the minds of loco men. We request you to follow high power
committee recommendations while dealing with real SPADS by taking employees
past service into consideration.
2. AN ACCIDENT WAITING
TO HAPPEN DUE TO INCREASED WORK LOAD:
Bangalore Division of All India Loco
Running Staff Association understood that some unsafe practice of crew
utilization is done in the depot. If such practices are continued, we can
expect more SPAD cases in the near future. Your Intervention is solicited to
check and stop such unsafe methods to make SBC Division free from accidents. Loco
pilots utilized in pooling as leave reserve in SBC depot are forced to take all
direction LRS for working in link 1&2. So they are working in 8 directions
covering more than 3000km with two types of tractions, which is nonexistent in
any other railway. No need to say about Type of locos, Number of Signals, L C
gates, PSRs, Gradients, weather etc. There is an endurance limit for a human to
remember such data for longer periods because of not working in all the
directions continuously.
As the number of directions have
increased, and used in leave reserve, they will be getting trains to a
particular directions once in two or three months. As their LR will not lapse
theoretically they have to work in that section with fear of SPADs, expecting
unknown signals in the section in which they have not worked for long time. Not
only this, caution order regarding new signals will be given for 10 days only.
A person who have not worked in the section during these days is likely to
commit SPAD. Maintaining separate leave reserve for Link 1&2 will solve the
problems to certain extant. The recommendation to the divisional authorities
regarding this is not yielded any positive result.
So we request your good office to
kindly look into this matter seriously and do needful to give necessary
instructions to limit working directions and maintain leave reserve for link
1&2 separately. We expect and look forward for an accident free year 2015
with your leadership.
3. OPENING OF GOODS
CREW DEPOT AT HUP:
SBC division is planning to open a
goods crew depot at HUP and willingness letter was asked. Administration has
cited operational convenience for the above. But overhead expenditure for
maintaining a new depot without considering the advantages is going to be a
huge burden for the administration. Equally staff will be put to hardship on
posting at the above Depot owing to education of their wards, family relocating
to a different state with a different language etc. More over if posted at the
above depot, many will not relocate their family and will be travelling from
Bangalore, resulting in inadequate rest and more accidents in future. Without
opening the above crew depot problem can be addressed by increasing staff
strength at SGT and moving crew pilot to HUP by any convenient trains.
4. REQUEST FOR CREW CHANGE
AT DMM FOR TRAINS TO GTL & DHNE:
All India Loco Running Staff
Association demands crew changing at DMM for all trains towards GTL & DHNE
in view of increased SPAD cases in the above section after the extended working
started in the above section. A scrutiny of the SPAD cases will reveal that
cases were less or nil crew change was available at DMM. A new running room may
be constructed at DMM.
5. COMPENSATORY RESTS
FOR THE LAPSED PR’s:
We have submitted several representations
regarding non-sanctioning of legitimate periodical rests for loco running staff
of SBC& SGT. We have received several complaints in this regard and erring
officials nominated to ensure implementation of HOER shall be taken up duly
verifying documents/ records related to this injustice. Here we would like to
stress that PR cannot lapse at any point of time and as per HOER, the employees
are eligible for a CR for each lapsed PR. Such violations will hamper smooth
industrial relation and will act as a catalyst for unrest among the employees
and is against safety.
6. INADEQUATE FOOT
PLATE TRAINING FOR NEW ALPS IN SWR:
Railway
board has prescribed 20 days handling for induction course of ALPs as per the
training module. But Railway Administration of SWR has curtailed this foot
plate training by joining Road and Signals learning with handling. An ALP
undergoing this dual training will be concentrating only on signals and road;
will be least bothered about handling. This will result in inadequate training
and they will be an unfinished product. This practice was introduced when ALP
position was acute. As this is a violation in training norms, we request your
good self to separate LRS from handling and may be given separately in view of
competency of the ALPS and safety.
7. IMPROVE THE RUNNING ROOM CONDITIONS:
Condition
of running room has to be improved by providing Air Conditioners in all the
running rooms. Most of the running rooms in Indian railways has started
converted to ac running rooms. The neighbouring konkan railway has already
converted their running room to AC. This is very important in view of the
repeated cases of SPAD and the unbearable heat prevails. As the staff is
getting only less time to take rest in the out station, this is very
important to increase the efficiency of
the running staff. The quality of subsidiary meals to be improved by duly
increasing the subsidy amount which can only ensure the good quality food for
which the RBO that Rs.27/- or 90% of the cost of meal whichever is less to be
modified to 90% of cost of meal shall be subsidized.
Many running rooms are maintained
like dormitory with insufficient wash basin, urinals, toilets & bathrooms
(VSG, BJP, DMM, ASK etc). T
8. ABOLISION OF CASTLE
ROCK DEPOT:
Castle
rock transfer has become a nightmare for running staff. The proposal for
abolition of this depot by strengthening Vasco depot is not yet implemented.
Running staff is not ready to go to castle rock depot due to the inherent
difficulties and lack of facilities like proper quarters or private
accommodation, medical, transport and educational facilities. Running staff is
forced to go to castle rock fearing of revenge and administration is treating
them like baggers’ by forcing them to sleep on the floor , eight members in one
hall like room in dormitory or five
members in one quarters just like animals. They cannot take proper rest due to
this community living. If anybody fell ill, he has to stay in the same room
with other members which are a potential threat to others. The right of the staff to stay with their
family, to impart good education to their children , right to proper and timely
health care etc.. is denied for the staff staying at here.
This
inhuman treatment towards running staff should be stopped. Castle rock depot
should be closed and Vasco depot should be strengthened.
9. LOW QUALITY WALKIE
TALKIE SETS
Loco
Pilots over South Western Railway have been supplied with walkie talkie sets
made by MOTOROLA and KENWOOD. Out of this KENWOOD walkie talkie sets are of
poor quality. It does not serve its purpose. Communication is difficult even
with guard and loco pilots, leave alone long distant communication. This set
also makes unnecessary noise while keeping on the control stand of general
locos due to radiation which adds the mental stress of loco pilots. Hence this
KENWOOD walkie talkie sets should be replaced with good quality walkie talkies
like MOTOROLA.
As per the
instructions from the higher level, The asst. loco pilots working in the GHAT
section should also be issued with walkie talkie due to the peculiar working
system and terrain. There is grave shortage of walkie talkie sets in castle
rock to issue walkie talkie sets to the Asst. Loco Pilots. Sufficient number of
walkie talkie sets should be made available at castle rock.
10. OXYGEN CYLINDERS AT
KULEM-CASTLE-ROCK- GHAT SECTION
Kulem
–castle rock ghat section being the second toughest ghat section in India ,
three WDG4 loco motives has been attached
as banker loco. The loco pilot and asst. loco pilots and asst. loco
pilots who are working in this locomotives are suffering from large amount of
smoke emits from the two leading and three banker loco motives when it passes
through the tunnels. They are unable to bear the smoke, often they reach to the
brink of suffocation by the time it passes through the tunnel. If the train
strands in the tunnels the locos will be in working condition and the crew
cannot run either side to save themselves out of the smoke. This situation has
not been studied by railways and if any such situation emerges the death of the
crew is fore sure.
Hence a detailed
study has to be conducted on this subject and oxygen cylinders should be
supplied to the banker loco crew
11. UNIFORM ALLOWANCE:
Uniform is
not supplied to the staff every year and disbursement of stitching charge is
improper and insufficient. The quality of the uniform material supplied by the
railways is very bad to such extend that most of the people either do not want
to accept it due to its poor quality and
too much darkness in colour.. The material gets faded after few months of
usage; hence most of the staff uses their own dress while on duty.
We demand
instead of supplying low quality uniform material, Uniform Allowance be
distributed to the staff, in turn they would purchase quality material and
stitch the uniform, or else high quality uniform material should be supplied to
the staff.
12. LACK OF QUARTERS:
There is
no quarters facility depots like Bijapur, Belgaum,Vasco-Da-Gama, Castle Rock ,
Tornagllu, And Hospet. Sufficient number of quarters should be constructed in
this area for the staff.
The
Maintenance of Railway quarters is very poor, in many places dilapidated
quarters still exist.
13. CLOSURE OF JVSL
REST ROON IN HUBBALI DIVISION.
The Rest
room provided by railways in JVSL in Hospet depot of Hubbali division is not
habitable due to the reasons that it is situated in the middle of highly air
polluted area. The Rest room is situated in the middle of running lines which
it is a threat to the life of the staff. Staff has to remain inside the rest
room always due to the high air pollution in the surroundings. Objection from
the staff that they cannot take proper rest in that rest room, an increase of
mental stress while staying in that rest room has fell on deaf ears.
The
construction of Running Room at Tornagallu is going on for the last seven years
which could not be completed yet. This shows the apathy of the administration
towards the staff.
We demand
the closure of the rest room at JVSL and speed up the construction of the
running room at TORNAGALLU so that any number of staff can be accommodated
there.
14. NEW SIGNALLING
SYSTEM:
The changes
made in the signaling system are a curse than a boon as far as the loco pilots
are concerned. The concept of pre warning is failed in the new system. Previously the loco pilot was fore sure that
if the distant signal is ATTENTION then home signal will be CAUTION with route
indicator. Now it may be main line or loop line. Suppose the route indicator or
its bulbs fails, loco pilots will see only main light of the home signal, and
may mistake that the train would be received to main line, due to the absence
of route indicator. He will come to know about the loop line only when he
approaches the point, and may enter the loop line with high speed because he
was under the impression that the train would be received to the main line and
there is a chance of derailment. This fault has already been reported from
various divisions.
Due to
this reasons loco pilots has started approaching the points with the speed of
the loop line despite being the home signal shows MAIN LINE , under the
impression that routing might have failed and it causes time loss for trains.
We request
your good office to take suitable measures to avoid such circumstances as if such
a situation happens the loco pilot will be the ultimate sufferer as per the
railway practice.
15.15 DAYS LEAVE SANCTIONING POWER SHOULD BE GIVEN TO ALL CCC’S.
The majority of the running staff of SWR hails from outside Karnataka and consumes almost 3 to 4 days for journey itself while proceeding to their native place on leave. For the out of state running staff, to spend at least a week at their native place and with their family members, at least 15 days of leave IS required when they are going to native. Unfortunately it is understood that all CCC’s has been deprived of the leave sanctioning power . For a leave of short duration, crew is forced to go the officers to meet in person. So it is very urgent to empower the depot official in charge himself to sanction a minimum of 15 days leaves/NH judiciously, working under him.
16.CREW SHOULD BE TAKEN BACK WITHIN 36 HRS FROM OUT STATION: Railway board issued orders vide Lr.No.E(II)2009/hoer/17.Dt 28.02.2010. (RBE 37/2010) is for reducing the absence of running staff from their Hqrs to 36 Hrs. But in this division Hubli and Hospet depot Goods crew are put at out station for 72/96 hours causing mental agony which reduces their concentration on running duties and owing to which the running staff are restless and their social life are affected badly. This is a situation which would force the staff to streets to protest against this.
17.
REDUCE THE DUTY HOURS TO 08 HRS
At present the loco running staffs are
forced to work unlimited hours every day on one pretext or other. The recent
instructions from railway board to restrict the duty hours to ten hours by
arranging relief to the crew at proper time is not followed in many divisions
especially in Hubli division. The data of duty hours reported to the head
quarters is manipulated. Even now there are cases where crew is harassed for
asking relief after ten hours. In Hubli division a PC message has been issued
to inform after completion of eight hours duty. Even after information, crew is
made to work beyond fourteen hours without arranging proper relief. The
parliamentary standing committee has recommended implementing 08 hrs duty for
all running staff from Sign On to Sign Off. So, the duty
hours may be fixed for running staff irrespective of the grade, at the maximum
of 8 hours from Signing ON to Signing OFF.
We hope that your good office will
intervene in this matters and issue necessary instructions to the concerned to
settle the problems of employees. We extend our whole hearted support to make this
railway a profitable and accident free railways in India.
Thanking You Yours Faithfully,
Arsikere
24.04.2015 (RAMESHAN K)
Copy to:
AGM, CME, CMPE, COM, CSO, CPO- Hubli
DRM, ADRM, Sr DME, Sr DPO- UBL, MYS
& SBC
DEE OP /SBC
0 comments:
Post a Comment