ALL INDIA
LOCO RUNNING STAFF ASSOCIATION
HQ ADRA Reg. No.
17903
AFF to AIREC
HUBLI
DIVISION,
SOUTH WESTERN RAILWAY ZONE.
AILRSA
Office, Hubli, Plot No:41, Azad Park, Gadag Road, Hubli 580020, ailrsaubl@gmail.com
PRESIDENT
SECRETARY TREASURER
S.Sargunanathan
K.Thirumalachari Sunil.M
------------------------------------------------------------------------------------------------------------------------------------------------------------------
Ref No: AILRSA/UBL/DIV/GEN/02/2014
dated 15/03/2014
To,
The Divisional Railway Manager,
Hubli division/SWR
Respected
sir,
Sub: Divisional Conference - Memorandum
All India Loco Running Staff
Association of Hubli division organized it’s divisional biennial general body
(BGM) meeting on 09/03/14 at Prakash restaurant, Hubli. The open session was
inaugurated by Sri Balaramaiah, zonal vice president, SCRly. Sri
Sargunanathan.S gave the welcome speech and was presided by Sri K.
Thirumalachari. The following comrades addressed the gathering.
1.
Sri G.N.Shaw, Divisional secretary,
AILRSA/GTL
2.
Sri S.Gangadharan, Divisional
president, AILRSA/GTL
3.
Sri Geomy George, Ex.Zonal
secretary, AILRSA,SRly
4.
Sri B.I.Illegar, District
president, CITU
5.
Sri C.Sunish, General secretary,
AILRSA,SWR
The divisional conference discussed
the problems of running staff prevailing in Hubli division and elected the
following members as new office bearers.
1.
President : Sri
S.Sargunanathan, LP/Goods/Hubli
2.
Vice President : Sri Joshil C.K, Crew controller/Hubli
Sri Dhananjay Kumar, Sr ALP/Hubli
3.
Secretary : Sri
K.Thirumalachary, LP/Mail/Exp/Hubli
4.
Joint secretary : Sri Bijoy Varghese, LP/Goods/Castlerock
Sri C.H.Govind Rao, Crew controller/Hospet
5.
Organizing secretary : Sri
Priyesh.N.V, Sr ALP/Hubli
Sri
Rajesh.K, Sr LP/Goods/Castlerock
6.
Treasurer : Sri
Sunil.M, LP/Goods/Hubli
AILRSA, based on the discussion
held over the issues and grievances of the running staff hereby, would like to
put up to your good office, the following burning problems prevailing in Hubli
division for an early and constructive redressal.
During the last six decades there
have been tremendous changes in the working of the Railways due to
modernization of rolling stock, sophistication of signaling system, tracks,
increase in trailing loads, introduction of high speed trains, longer run at a
stretch for 3/4 hours or more, undivided attention, minute-to-minute alertness,
as a result of which, duties and responsibilities of Loco Running Staff has
been increased by leaps and bounds. Safe running of trains, maintaining
punctuality have become the corner stone of the Railways’ working. And it is
quite obvious that to attain this, running staff should be stress free,
physically and mentally strong, which in turn emphasis on the need of
cultivating a safe and hassle free working environment.
Unfortunately, today we had a sad
story of running staff to tell about; over burdened, restless, low in morale,
highly stressed, high rate of absenteeism mainly due to the contemptible
approach of the railway administration towards them. It is a fact that Railway
Board has given stringent guidelines in the matter of safety; especially the
SPAD committee recommendations, but the divisional authorities of Hubli
division had failed to implement the above guidelines in force due to which
safe running of the trains in the division has become a matter of
question, for which AILRSA express our extreme concerns and request your good
office to take sincere initiations to implement the Railway Board’s safety
guidelines immediately and to redress the grave issues associated with them.
1. Conflicting signaling systems
employed at UBL division contributing to “SPAD”
The recent change in the signaling
system between UBL – GTL section in conflict with the existing fundamental
concepts of distant signal aspect ingrained in the minds of loco pilots had
created doubts and confusion among the running staff. Particularly, for a crew
working a train between UBL to BJP has to negotiate two types of signaling systems
regularly. This is the case with the goods crew working crack spls also. The
present changed sequencing of signals in the newly employed signaling system
also puts loco pilots in dilemma. For ex: wherever inner home provided with
routing to byepass and routing home signals for station are in place, when the
distant signal is showing attention aspect it is not indicating directly
whether the train is being received on byepass line or main line and due to
confusion, a Locopilot (pass/mailexp) after passing the distant signal with
attention aspect coming with restricted speed, due to uncertainty and lack of
proper visibility of the routing signal, is mentally prepared to pass the Inner
Home, if “taken off” for the diversion, all chance of shooting the signal
exists. At NVU station trains are being stopped at Inner Home even when the
distant signal is given proceed aspect, which is very much contrary to the
General Rules itself. At HPT station all starter signals are provided with
directional type route indicators which in turn are being taken off for main
line dispatch also, which is against the “SR”. At GDG station, employing two
mainline concepts towards UBL direction, starter signals are provided with
directional type route indicators. This posts immense confusion for the loco
pilots as the route indication changes with the change in main line also.
Provision of Stencil type route indicators instead of directional type will
avoid such unwanted confusion. From the running staff’s point of view, a loco pilot,
during his entire stretch of duty encountering such variants in signaling makes
him vulnerable to mistakes.
Notwithstanding, signals are placed
at curves without considering the adequate sighting distance, poorly
maintained, covered with dust making it difficult to pick up it’s aspects
early. The kilometer boards placed are not raised sufficiently from the ground,
not illuminated properly, and often hindered by the ballast and bushes. Most of
the temporary caution spots are not protected with engineering indicators. Loop
line termination boards are not provided in UBL division. Providing permanent
speed indicators below the respective caution indicators will improve the
alertness and judgment of locopilots in controlling the train more efficiently.
AILRSA urges your good office to instruct the signaling committee to play a
pro-active role in identifying the above mentioned discrepancies and resolving
it.
2. Call for judicious cadre review of
running staff:
Duty hours of the crew is
stretching beyond limits in Hubli division violating all the safety norms
prescribed by the Railway board. It is adversely affecting their health,
ultimately results in accidents. The annual cadre review of loco running staff
is not matching with the real time demand in Goods/Passenger/Mail/Express
services. Augmented no of officiating crew on higher grades are the direct
impact and the consequences are insufficient rest, lapsing of LR currency over
different sections, frequent out of turn crew bookings at HQ and outstations,
staff not getting sufficient leaves etc., Express links are made in such a way
that a loco pilot will be getting a train in a particular section only once in
a month making LP’s to skip off certain SOB stoppages for certain trains.
AILRSA urges the administration to consider all these factors in performing the
cadre review giving ample provision of leave reserve and trainee reserve posts.
3. Sub-standard quality of food and
drinking water at running rooms:
Most of the water purifiers
installed at running rooms are not working satisfactorily due to lack of proper
service and maintenance, forcing the inmates to consume contaminated, impure
water making them sick very often and cultivating other health disorders.
Umpteen complaints and representations had been already served by this
association regarding this and the sub standard food being served at running
rooms as being brought out by the inmates, especially at BJP running room, but
no action had been taken so far. Adding salt to injury, contracts are being
renewed to the same accused contractor which makes enough reasons to smell some
foul trades being going on behind the scene. The contract renewal of the BJP
running room is getting delayed indefinitely since Oct 2013. It is known that
the existing contracts of certain other running rooms are also about to expire
within days and the procedures for renewal of the contracts is yet to be
commenced.
4.
Sanctioning of Periodical Rest.
Railway administration had
always found pleasure in toying with the periodical rest rule of the running
staff. It looks funny, as the same administration which propagates the safety
habit of “Take proper rest before coming for duty” relentlessly tries to
curtail the eligible rest itself. The Railways had classified the running
staff as “continuous” category. Again and again it is reiterated that all the
rules which governs the staff falling in continuous category is applicable for
the running staff also. Continuous category staff are eligible for one 30 hr PR after 6th
day. Their duty roster should have a definite PR day.[para 195 of Rajyadhyaksha
award committee report] For running staff it may not be possible to fix the day
due to their nature of duty. In the same report para 284 clearly defines
periodical rest for running staff. It accepts that PR for running staff cannot
be roistered like other staff, i.e, it may not be possible to give PR exactly
after the 6th day. Therefore the committee gave an advantage to
running staff by stating that “Having
regard to the nature of their employment, the rules on the subject have to
provide a measure of elasticity”. The word “elasticity” on this context
clearly intends that PR for the running staff can be granted at any time, i.e,
PR can be granted even before the 6th day due to the uncertainty of
availability of running staff at their headquarter exactly at the 6th
day. [Judiciously we can conclude it as four 30hrs PR at any time in a month].
A judicial review over these lines will make it clear that 4 30 hrs PR in month
is the right of a running staff. Unlike some of our over enthusiastic
officials, who had recently invented, a PR is not an earned rest, rather it is
a part of universally accepted weekly rest for the employees worldwide. Any
violation in this regard can be amounted to the violation of HOER.
Hence, this association request
your kind intervention into the matter with a broader perspective and to give
necessary instructions to all Crew Controllers to mark the eligible PR and ensure
that four 30 hrs PR in a month are granted for all the running staffs of Hubli
Division.
This
association also urges the administration, as upheld by the Dharwad High court
(Case No WP 66707/2010) against the railway’s appeal, to implement the RLC’s judgement of 30 + 16
hrs periodical rest immediately.
5. Empowering the depot official in
sanctioning leaves:
This organization would like to
put into your kind notice that majority of the running staff of UBL division
hails from outside Karnataka and consumes almost 3 to 4 days for journey itself
while proceeding to their native place on leave. Unlike the local employees,
this unique characteristic of UBL division demands at least 10 to 15 days of
leave requirement for the out of state running staff, to spend at least a week
at their native place and with their family members. Till date CCC/UBL, who
understands them better, used to sanction their leaves upto the limit of 15
days from his office itself. Unfortunately it is understood that CCC/UBL had
been deprived of the leave sanctioning power extending more than 04 days. Being
running staff and the nature of their work itself makes it harder and
disturbing in getting their eligible leaves of even small duration also granted
from higher officials. This association urges to empower the depot official in
charge himself to sanction enough number of leaves/NH judiciously, working
under him.
6. Reducing the out station detention
(OSD) of the crew to 36 hrs:
Even though Railway board has given
strict guidelines to reduce the OSD of the crew to 36hrs vide letter No.E(LL)
2009/HER/1 RBE No.37/2010 Dated 26.02.2010, the mechanical branch of Hubli
division has shown a deaf ear towards it. Due to this serious lapse the OSD of
the majority of goods crew exceeds beyond 72hrs owing to which the running
staff are restless and their social life are affected badly.
7. Night rest after 2/3 night duties:
Though Railway board has given
clear instructions to provide night rest for running staff after performing 2/3
night duties, it has still being kept in paper by the divisional authorities.
It is a fact that many accidents in hubli division would have been averted if
the divisional authorities have shown some interest in following railway
board’s guidelines in this matter.
8. Resuming/Reporting for duty should
be made at 06.00hrs:
As suggested by the SPAD committee,
crew which reports after/ leave/sickness/training should be booked after 6 hrs
instead of odd hours, thus applying little sense of relevance.
9. Declaring TNGL – GTL section as
handicapped:
Declaring the TNGL – GTL section as
handicapped is a long pending demand from this organization and the HPT crew
working in this section are losing their average mileage daily. It is a well
known fact that kilometer mileage constitutes a part of the running staff’s
basic salary itself and depriving the minimum national average mileage for the
HPT crew in lieu of administration’s complacency amounts to the denial of
natural justice. This association strongly protests against the disdain
attitude of the administration in this regard and urges to issue the orders for
the same along with the payment of arrears of the mileage lost over these
years.
10.
Preposterous treatment meted out to running staff at the
Railway Hospital:
If at all a running staff becomes
sick and reports at railway hospital with sick memo, the attitude of Medical
Officer towards them makes one to believe that they are not human beings but
“robots”. In their opinion “a running staff cannot become sick” or if at all he
is sick he cannot be kept in sick list. AILRSA vehemently protests against this
preposterous attitude of medical authorities to running staff and request you
to resolve this issue in true spirit.
AILRSA humbly
request your good office to intervene into the above matters seriously and
resolves it in a constructive manner at the earliest.
Yours faithfully
19.03.14
K.Thirumal Achari
Hubli.
(Divisional Secretary)
Mob:
9731668485
Copy to: 1. Commissioner of Railway Safety/SBC 2. Chief Mechanical
Engineer/SWR 3. Chief Operational Manager/SWR 4. Chief Safety Officer/SWR 5.
Sr. Divisional Safety Officer/UBL/SWR6. Sr. Divisional Mechanical
Engineer/P/UBL/SWR
1 comments:
Thanks for uploading information about this, this is right way.
meeting facilities in hubli
Post a Comment